Federation Navy 200mm Railgun
FactionMediumFederation Navy 200mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
The 200mm railgun works much the same as its big brother except that it is considerably faster but also less powerful. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
122.17m ISK
90d Avg
34.85m ISK
Volume
10 m³
Base Price
100.0k ISK
Jita Market (90d)
Latest Price (2026-05-23)
122.17m ISK
90d Average
34.85m ISK
90d High
137.00m ISK
90d Low
120.2k ISK
Avg Daily Volume
4
Variations(10)
200mm Railgun I
Tech I
200mm Carbide Railgun I
Tech I
200mm 'Scout' Accelerator Cannon
Tech I
200mm Compressed Coil Gun I
Tech I
200mm Prototype Gauss Gun
Tech I
200mm Railgun II
Tech II
Shadow Serpentis 200mm Railgun
Faction
Dread Guristas 200mm Railgun
Faction
Caldari Navy 200mm Railgun
Faction
Federation Navy 200mm Railgun
Faction
Recent Destructions
View all →Cyclone· Tumo Kei · Ravarin
105.86mDeimos· Jack Dyeson · Deltole
910.39mMoa· Enturi · Maurasi
845.59mVexor Navy Issue· Roeniveine · ZLO3-V
493.04mBrutix· Halgarth · Decon
330.16mExequror Navy Issue· Naufragiate · AD087
97.47mIshtar· UnconcernedReaper · Jita
4.75bBrutix· Obi Sunrider · Oulley
144.68mEnforcer· X6-88 Toralen · D87E-A
3.22bExequror Navy Issue· Tomac Tesori · Haatomo
402.07mRequired Skills
Attributes
Activation Cost3.6 GJ
Structure HP40
Powergrid Usage158 MW
CPU Usage37 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID15841
Group ID74
Category ID7
Mass1,000 kg
Volume10 m³
Capacity1 m³
Portion Size1
Radius10 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-23122.17m3
2026-05-05137.00m6
2026-04-26120.2k5
2026-04-1210.00m4
2026-04-0610.00m3
2026-04-0510.00m6
2026-03-229.99m1
2026-03-0410.00m4
2026-02-284.40m5