Shadow Serpentis 200mm Railgun
FactionMediumShadow Serpentis 200mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
The 200mm railgun works much the same as its big brother except that it is considerably faster but also less powerful. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
1.10m ISK
90d Avg
1.66m ISK
Volume
10 m³
Base Price
100.0k ISK
Jita Market (90d)
Latest Price (2026-08-26)
1.10m ISK
90d Average
1.66m ISK
90d High
4.46m ISK
90d Low
1.07m ISK
Avg Daily Volume
5
Variations(10)
200mm Railgun I
Tech I
200mm Carbide Railgun I
Tech I
200mm 'Scout' Accelerator Cannon
Tech I
200mm Compressed Coil Gun I
Tech I
200mm Prototype Gauss Gun
Tech I
200mm Railgun II
Tech II
Shadow Serpentis 200mm Railgun
Faction
Dread Guristas 200mm Railgun
Faction
Caldari Navy 200mm Railgun
Faction
Federation Navy 200mm Railgun
Faction
Recent Destructions
View all →Vigilant· aaye · Ahbazon
610.18mVigilant· Jen Ipsilon · Wirashoda
413.86mArazu· Altair Gallente · Auga
242.55mVexor· CHAOJIXIE · Otou
41.11mMoa· Bambi Murawski · Maurasi
211.38mMoa· Atorn Tian · Pakkonen
24.73mAstarte· q231i · J231837
1.18bVexor· Bobbing Apple · PVH8-0
61.35mVexor· Bobbing Apple · PVH8-0
43.55mVexor Navy Issue· Jc Sun · Sujarento
313.57mRequired Skills
Attributes
Activation Cost3.6 GJ
Structure HP40
Powergrid Usage158 MW
CPU Usage37 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID13868
Group ID74
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Capacity1 m³
Portion Size1
Radius10 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-261.10m1
2026-08-251.16m2
2026-08-231.22m11
2026-08-221.22m2
2026-08-212.94m6
2026-08-203.33m2
2026-08-191.21m1
2026-08-171.40m8
2026-08-134.43m3
2026-08-091.90m7
2026-08-081.21m20
2026-08-061.65m4
2026-08-051.19m2
2026-08-021.13m2
2026-08-011.88m11
2026-07-301.18m1
2026-07-291.18m1
2026-07-281.12m8
2026-07-271.12m4
2026-07-261.16m15
2026-07-251.12m3
2026-07-241.11m5
2026-07-231.11m1
2026-07-221.11m5
2026-07-211.11m2
2026-07-201.11m1
2026-07-191.11m3
2026-07-181.11m1
2026-07-171.11m2
2026-07-161.11m3