Caldari Navy 200mm Railgun
FactionMediumCaldari Navy 200mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
The 200mm railgun works much the same as its big brother except that it is considerably faster but also less powerful. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
22.92m ISK
90d Avg
13.63m ISK
Volume
10 m³
Base Price
100.0k ISK
Jita Market (90d)
Latest Price (2026-07-07)
22.92m ISK
90d Average
13.63m ISK
90d High
34.88m ISK
90d Low
4.07m ISK
Avg Daily Volume
5
Variations(10)
200mm Railgun I
Tech I
200mm Carbide Railgun I
Tech I
200mm 'Scout' Accelerator Cannon
Tech I
200mm Compressed Coil Gun I
Tech I
200mm Prototype Gauss Gun
Tech I
200mm Railgun II
Tech II
Shadow Serpentis 200mm Railgun
Faction
Dread Guristas 200mm Railgun
Faction
Caldari Navy 200mm Railgun
Faction
Federation Navy 200mm Railgun
Faction
Recent Destructions
View all →Moa· Bambi Murawski · Maurasi
177.22mMoa· Bambi Murawski · Maurasi
247.55mFalcon· Luri Isim · PF-346
332.13mProteus· LeConte Boudreaux · 1W-0KS
995.20mIshtar· Craighorn Cesaille · KBP7-G
719.65mProteus· Vermelho dol Sol · Vehan
1.47bFalcon· olddognewtrick · Jita
400.82mIshtar· Craighorn Cesaille · KBP7-G
1.01bVexor Navy Issue· Garenna · AD081
150.98mMoa· olddognewtrick · Sakht
132.55mRequired Skills
Attributes
Activation Cost3.6 GJ
Structure HP40
Powergrid Usage143 MW
CPU Usage37 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID15821
Group ID74
Category ID7
Mass1,000 kg
Volume10 m³
Capacity1 m³
Portion Size1
Radius10 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-0722.92m8
2026-07-0519.01m22
2026-07-0214.47m6
2026-06-294.23m4
2026-06-234.20m4
2026-06-2215.00m1
2026-06-194.12m2
2026-06-184.12m3
2026-06-1321.89m7
2026-06-0329.76m5
2026-05-314.11m1
2026-05-3029.55m7
2026-05-274.09m2
2026-05-2629.98m4
2026-05-2330.00m3
2026-05-1934.88m2
2026-05-124.08m2
2026-05-1015.38m4
2026-05-0314.96m12
2026-04-254.08m1
2026-04-234.08m3
2026-04-214.08m1
2026-04-184.08m6
2026-04-154.08m4