Caldari Navy 200mm Railgun
FactionMediumCaldari Navy 200mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
The 200mm railgun works much the same as its big brother except that it is considerably faster but also less powerful. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
5.71m ISK
90d Avg
19.84m ISK
Volume
10 m³
Base Price
100.0k ISK
Jita Market (90d)
Latest Price (2026-10-01)
5.71m ISK
90d Average
19.84m ISK
90d High
43.69m ISK
90d Low
4.30m ISK
Avg Daily Volume
3
Variations(10)
200mm Railgun I
Tech I
200mm Carbide Railgun I
Tech I
200mm 'Scout' Accelerator Cannon
Tech I
200mm Compressed Coil Gun I
Tech I
200mm Prototype Gauss Gun
Tech I
200mm Railgun II
Tech II
Shadow Serpentis 200mm Railgun
Faction
Dread Guristas 200mm Railgun
Faction
Caldari Navy 200mm Railgun
Faction
Federation Navy 200mm Railgun
Faction
Recent Destructions
View all →Eagle· Hazel asla · Ahbazon
369.76mLachesis· Tien Togakura · Old Man Star
532.64mProteus· Kai Denryu · J155831
543.11mMoa· Bambi Murawski · Maurasi
177.22mMoa· Bambi Murawski · Maurasi
247.55mFalcon· Luri Isim · PF-346
332.13mProteus· LeConte Boudreaux · 1W-0KS
995.20mIshtar· Craighorn Cesaille · KBP7-G
719.65mProteus· Vermelho dol Sol · Vehan
1.47bFalcon· olddognewtrick · Jita
400.82mRequired Skills
Attributes
Activation Cost3.6 GJ
Structure HP40
Powergrid Usage143 MW
CPU Usage37 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID15821
GroupHybrid Weapon (74)
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Capacity1 m³
Portion Size1
Radius10 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-015.71m2
2026-09-305.71m1
2026-09-2743.67m4
2026-09-245.69m1
2026-09-2143.68m2
2026-09-134.30m6
2026-09-114.31m7
2026-09-045.58m4
2026-08-305.56m1
2026-08-1734.92m5
2026-08-1515.00m1
2026-08-144.56m1
2026-08-124.54m1
2026-08-1030.28m3
2026-08-0930.24m3
2026-08-0237.99m6
2026-07-314.34m6
2026-07-274.32m1
2026-07-264.32m1
2026-07-2239.99m1
2026-07-2131.94m5
2026-07-1932.00m6
2026-07-1633.48m6
2026-07-1331.95m4
2026-07-1131.99m3