Dread Guristas 200mm Railgun
FactionMediumDread Guristas 200mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
The 200mm railgun works much the same as its big brother except that it is considerably faster but also less powerful. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
2.00m ISK
90d Avg
1.96m ISK
Volume
10 m³
Base Price
100.0k ISK
Jita Market (90d)
Latest Price (2026-10-11)
2.00m ISK
90d Average
1.96m ISK
90d High
4.13m ISK
90d Low
1 ISK
Avg Daily Volume
9
Variations(10)
200mm Railgun I
Tech I
200mm Carbide Railgun I
Tech I
200mm 'Scout' Accelerator Cannon
Tech I
200mm Compressed Coil Gun I
Tech I
200mm Prototype Gauss Gun
Tech I
200mm Railgun II
Tech II
Shadow Serpentis 200mm Railgun
Faction
Dread Guristas 200mm Railgun
Faction
Caldari Navy 200mm Railgun
Faction
Federation Navy 200mm Railgun
Faction
Recent Destructions
View all →Phobos· Iggadur Brell Krividus · Amamake
1.13bVigilant· Pest No Pro · Uemon
527.60mProteus· Leyo Desp · Tama
925.33mProteus· Ccqit · G-Q5JU
583.53mProteus· Leyo Desp · Tama
769.20mProteus· Leyo Desp · Tama
1.53bIshtar· Bearpaws wolfin · T-GCGL
244.16mProteus· M42T · Y-DW5K
1.42bProteus· Leyo Desp · Onatoh
820.46mIshtar· Bearpaws wolfin · T-GCGL
635.85mRequired Skills
Attributes
Activation Cost3.6 GJ
Structure HP40
Powergrid Usage143 MW
CPU Usage37 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID13870
GroupHybrid Weapon (74)
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Capacity1 m³
Portion Size1
Radius10 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-112.00m2
2026-10-101.27m2
2026-10-093.65m6
2026-10-083.18m9
2026-10-073.40m11
2026-10-061.27m1
2026-10-052.61m9
2026-10-041.26m1
2026-10-033.45m13
2026-10-021.26m1
2026-10-012.89m8
2026-09-302.37m10
2026-09-292.11m22
2026-09-282.06m24
2026-09-271.25m5
2026-09-262.28m7
2026-09-251.25m5
2026-09-241.25m2
2026-09-232.11m11
2026-09-221.73m4
2026-09-211.24m2
2026-09-201.92m6
2026-09-191.46m8
2026-09-182.83m4
2026-09-171.24m1
2026-09-162.23m8
2026-09-152.53m11
2026-09-141.24m1
2026-09-132.03m6
2026-09-122.29m6