Metenox Moon Drill

Metenox Moon Drill

Mining Structures

Metenox Moon Drill — Upwell Moon Drill (Structure) — EVE Online item

The Upwell Consortium, renowned for its successful Athanor and Tatara class refineries, recognized the mounting challenges faced by its customers with moon-mining operations. In response, they unveiled the Metenox moon drill, a hands-off deployable employing traditional surface-grazing techniques.

Although these autonomous facilities are less efficient at material extraction than refineries and are more vulnerable to raids due to lighter plating, short reinforcement windows, and also garner high power demands requiring colony reagents, the Consortium insists that their autonomous functionality is a worthy trade-off.

Please note: The Metenox moon drill must be positioned within 250km of an eligible moon mining site and exclusively in systems rated 0.4 security or lower.
Jita Price
640.29m ISK
90d Avg
684.97m ISK
Volume
6,000 m³
Today (3rd October)
Page 1
Yesterday (2nd October)
1st October
30th September
29th September
28th September
27th September
26th September
Page 1