Standup Cap Battery II
Structure Tech IICapacitor BatteriesStandup Cap Battery II — Structure Tech II Structure Capacitor Battery (Structure Module) — EVE Online item
Standup Cap Battery modules augment a structure's available supply of capacitor energy.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
101.00m ISK
90d Avg
106.19m ISK
Volume
4,000 m³
Jita Market (90d)
Latest Price (2026-08-26)
101.00m ISK
90d Average
106.19m ISK
90d High
129.10m ISK
90d Low
30.45m ISK
Avg Daily Volume
2
Variations(2)
Standup Cap Battery II
Structure Tech II
Standup Cap Battery I
Structure Tech I
Recent Destructions
View all →Fortizar· Unknown Pilot · Sortet
17.41bAstrahus· Unknown Pilot · J164235
4.37bAzbel· Unknown Pilot · Sortet
9.68bAstrahus· Unknown Pilot · Sortet
4.46bAstrahus· Unknown Pilot · J160941
3.35bFortizar· Unknown Pilot · J133252
16.46bAstrahus· Unknown Pilot · Gyerzen
3.93bAzbel· Unknown Pilot · Vahunomi
17.26bFortizar· Unknown Pilot · J122520
15.36bFortizar· Unknown Pilot · J161411
15.95bAttributes
Structure HP40
Powergrid Usage360000 MW
CPU Usage4800 tf
Reprocessing Materials
Properties
Type ID47353
Group ID1966
Category ID66
Mass500 kg
Volume4,000 m³
Packaged Volume4,000 m³
Portion Size1
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-26101.00m1
2026-08-25101.00m1
2026-08-24101.00m1
2026-08-23101.00m1
2026-08-22101.00m1
2026-08-21101.00m3
2026-08-20100.33m3
2026-08-1999.38m5
2026-08-1864.69m2
2026-08-1798.88m3
2026-08-1698.92m2
2026-08-1477.50m1
2026-08-13101.80m3
2026-08-12102.00m1
2026-08-11102.00m1
2026-08-10102.00m1
2026-08-08102.75m2
2026-08-07102.60m1
2026-08-04103.80m1
2026-08-02103.95m2
2026-08-01104.00m1
2026-07-3085.16m1
2026-07-29106.45m2
2026-07-28106.50m1
2026-07-2785.16m1
2026-07-26107.25m2
2026-07-25108.45m2
2026-07-24108.25m2
2026-07-2288.06m2
2026-07-2188.52m1