Standup Cap Battery I
Structure Tech ICapacitor BatteriesStandup Cap Battery I — Structure Tech I Structure Capacitor Battery (Structure Module) — EVE Online item
Standup Cap Battery modules augment a structure's available supply of capacitor energy.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
22.69m ISK
90d Avg
25.32m ISK
Volume
4,000 m³
Jita Market (90d)
Latest Price (2026-09-30)
22.69m ISK
90d Average
25.32m ISK
90d High
29.84m ISK
90d Low
19.58m ISK
Avg Daily Volume
3
Variations(2)
Standup Cap Battery II
Structure Tech II
Standup Cap Battery I
Structure Tech I
Recent Destructions
View all →Astrahus· Unknown Pilot · Roua
1.95bAstrahus· Unknown Pilot · J144732
3.28bAstrahus· Unknown Pilot · J122832
2.29bAthanor· Unknown Pilot · Gosalav
2.27bAstrahus· Unknown Pilot · Onsooh
2.22bAstrahus· Unknown Pilot · Dooz
2.24bAstrahus· Unknown Pilot · Yria
2.84bFortizar· Unknown Pilot · J152827
14.64bAthanor· Unknown Pilot · Torrinos
2.68bAstrahus· Unknown Pilot · J215117
2.26bAttributes
Structure HP40
Powergrid Usage300000 MW
CPU Usage4000 tf
Reprocessing Materials
Properties
Type ID47352
Category ID66
Mass500 kg
Volume4,000 m³
Packaged Volume4,000 m³
Portion Size1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-09-3022.69m4
2026-09-2920.96m1
2026-09-2821.96m3
2026-09-2720.96m1
2026-09-2622.29m9
2026-09-2523.95m1
2026-09-2422.95m3
2026-09-2223.95m3
2026-09-2123.97m1
2026-09-2023.99m2
2026-09-1822.43m5
2026-09-1723.54m1
2026-09-1622.76m2
2026-09-1524.59m1
2026-09-1324.69m1
2026-09-1225.66m1
2026-09-1125.65m1
2026-09-1024.90m1
2026-09-0924.90m1
2026-09-0825.50m5
2026-09-0720.88m1
2026-09-0523.93m6
2026-09-0425.59m2
2026-09-0324.03m3
2026-09-0223.25m2
2026-09-0125.66m1
2026-08-3125.64m6
2026-08-3021.06m5
2026-08-2921.09m3
2026-08-2828.98m1