250mm 'Flintlock' Railgun
StorylineMedium250mm 'Flintlock' Railgun — Storyline Hybrid Weapon (Module) — EVE Online item
Cruiser-sized large barrel turret. Railguns use magnetic rails to fire solid chunks of matter at hypersonic speed. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
3.75m ISK
90d Avg
2.48m ISK
Volume
10 m³
Base Price
150.0k ISK
Jita Market (90d)
Latest Price (2026-05-24)
3.75m ISK
90d Average
2.48m ISK
90d High
6.99m ISK
90d Low
2.0k ISK
Avg Daily Volume
7
Variations(11)
250mm Railgun I
Tech I
250mm Prototype Gauss Gun
Tech I
250mm 'Scout' Accelerator Cannon
Tech I
250mm Carbide Railgun I
Tech I
250mm Compressed Coil Gun I
Tech I
250mm Railgun II
Tech II
250mm 'Flintlock' Railgun
Storyline
Shadow Serpentis 250mm Railgun
Faction
Dread Guristas 250mm Railgun
Faction
Caldari Navy 250mm Railgun
Faction
Federation Navy 250mm Railgun
Faction
Recent Destructions
View all →Ishtar· Sly Darklighter · Doril
534.37mPraxis· Imperium420 · Innia
246.73mVexor· Imperium420 · Aurohunen
29.92mBrutix· Grallebos Loutte · FBH-JN
104.32mExequror Navy Issue· CAT0 SAY0NARA · BMNV-P
96.99mMoa· Black Taino · Tama
142.46mVexor Navy Issue· PROPOK · G-JC9R
98.62mVexor Navy Issue· PROPOK · Carrou
118.40mIshtar· Grandmaster Sasha · Pakkonen
192.11mProteus· Ghowsty · J104835
498.66mRequired Skills
Attributes
Activation Cost6.3 GJ
Structure HP40
Powergrid Usage179 MW
CPU Usage32 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID20589
Group ID74
Category ID7
Mass1,000 kg
Volume10 m³
Capacity0.5 m³
Portion Size1
Radius100 m
Meta Level6
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-243.75m14
2026-05-233.11m6
2026-05-213.69m6
2026-05-202.58m8
2026-05-193.36m12
2026-05-183.99m3
2026-05-173.91m6
2026-05-143.55m5
2026-05-13208.6k4
2026-05-12208.6k1
2026-05-103.67m7
2026-05-093.34m4
2026-05-083.00m6
2026-05-062.44m5
2026-05-05208.4k2
2026-05-033.70m5
2026-05-01208.4k5
2026-04-30208.6k1
2026-04-236.33m6
2026-04-213.49m7
2026-04-20156.8k3
2026-04-163.53m14
2026-04-152.99m2
2026-04-133.00m5
2026-04-112.00m1
2026-04-093.96m7
2026-04-073.77m6
2026-04-063.85m5
2026-04-022.73m7
2026-04-01152.2k1