Dread Guristas 250mm Railgun
FactionMediumDread Guristas 250mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
Cruiser-sized large barrel turret. Railguns use magnetic rails to fire solid chunks of matter at hypersonic speed. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
19.36m ISK
90d Avg
19.37m ISK
Volume
10 m³
Base Price
75.0k ISK
Jita Market (90d)
Latest Price (2026-10-04)
19.36m ISK
90d Average
19.37m ISK
90d High
43.21m ISK
90d Low
121.1k ISK
Avg Daily Volume
9
Variations(11)
250mm Railgun I
Tech I
250mm Prototype Gauss Gun
Tech I
250mm 'Scout' Accelerator Cannon
Tech I
250mm Carbide Railgun I
Tech I
250mm Compressed Coil Gun I
Tech I
250mm Railgun II
Tech II
250mm 'Flintlock' Railgun
Storyline
Shadow Serpentis 250mm Railgun
Faction
Dread Guristas 250mm Railgun
Faction
Caldari Navy 250mm Railgun
Faction
Federation Navy 250mm Railgun
Faction
Recent Destructions
View all →Proteus· Gyro DuAquin1 · J170445
1.88bProteus· Sultanhatun · 6-AOLS
729.83mProteus· Dark Aiden · FD53-H
1.20bProteus· Gabbot · LGUZ-1
1.24bProteus· Gyro DuAquin1 · J110413
2.28bProteus· Selrina · Angymonne
715.85mVigilant· RTSAvalanche · Asghed
749.73mTengu· Dr Wilson · Ichoriya
875.53mTengu· Dr Wilson · Otela
837.43mDominix· Samec Indrustry · WV-0R2
698.45mRequired Skills
Attributes
Activation Cost5.6 GJ
Structure HP40
Powergrid Usage179 MW
CPU Usage42 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID13873
GroupHybrid Weapon (74)
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Capacity0.5 m³
Portion Size1
Radius100 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0419.36m4
2026-10-0314.66m38
2026-10-0219.70m13
2026-10-0112.86m3
2026-09-3020.92m17
2026-09-29121.1k1
2026-09-2820.44m14
2026-09-2712.32m2
2026-09-2620.87m23
2026-09-2518.98m16
2026-09-2320.87m44
2026-09-2219.99m16
2026-09-2119.73m1
2026-09-2019.77m2
2026-09-1920.37m8
2026-09-1819.78m11
2026-09-1722.02m6
2026-09-1619.73m4
2026-09-1522.87m8
2026-09-1422.22m10
2026-09-1324.23m6
2026-09-1019.21m13
2026-09-0919.02m3
2026-09-0818.89m2
2026-09-0718.74m1
2026-09-0630.15m6
2026-09-0521.99m4
2026-09-0431.73m6
2026-09-0328.52m8
2026-09-0216.54m1