Dread Guristas 250mm Railgun
FactionMediumDread Guristas 250mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
Cruiser-sized large barrel turret. Railguns use magnetic rails to fire solid chunks of matter at hypersonic speed. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
18.91m ISK
90d Avg
17.45m ISK
Volume
10 m³
Base Price
75.0k ISK
Jita Market (90d)
Latest Price (2026-08-19)
18.91m ISK
90d Average
17.45m ISK
90d High
32.10m ISK
90d Low
3.25m ISK
Avg Daily Volume
9
Variations(11)
250mm Railgun I
Tech I
250mm Prototype Gauss Gun
Tech I
250mm 'Scout' Accelerator Cannon
Tech I
250mm Carbide Railgun I
Tech I
250mm Compressed Coil Gun I
Tech I
250mm Railgun II
Tech II
250mm 'Flintlock' Railgun
Storyline
Shadow Serpentis 250mm Railgun
Faction
Dread Guristas 250mm Railgun
Faction
Caldari Navy 250mm Railgun
Faction
Federation Navy 250mm Railgun
Faction
Recent Destructions
View all →Proteus· Firinmah Lazor · UMI-KK
2.41bTengu· VioUltimatum · Kuharah
622.56mIshtar· Major Motoko Kusanagii · Hakonen
362.05mProteus· Micahel wu · E3-SDZ
1.01bAstarte· Cizani · SS-GED
777.64mProteus· Cal 7 · Tunudan
1.27bLachesis· Markus Wahlenyr · Hagilur
599.09mVigilant· Espen Onzo · KW-OAM
487.53mMoa· Anro Kaetama · Jita
106.33mProteus· darknetic Alabel · GY6A-L
1.04bRequired Skills
Attributes
Activation Cost5.6 GJ
Structure HP40
Powergrid Usage179 MW
CPU Usage42 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID13873
Group ID74
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Capacity0.5 m³
Portion Size1
Radius100 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1918.91m12
2026-08-1817.08m6
2026-08-1715.81m5
2026-08-1617.45m9
2026-08-1517.61m8
2026-08-1416.27m1
2026-08-1316.25m3
2026-08-1218.49m7
2026-08-1116.22m5
2026-08-1017.94m9
2026-08-0916.13m3
2026-08-0716.11m2
2026-08-0626.97m6
2026-08-0524.70m8
2026-08-0422.53m9
2026-08-0321.26m8
2026-08-0217.82m15
2026-08-0117.27m8
2026-07-3117.96m5
2026-07-3017.09m20
2026-07-2915.32m5
2026-07-2821.86m6
2026-07-2723.23m3
2026-07-2616.62m27
2026-07-2517.36m12
2026-07-2417.10m11
2026-07-2317.75m6
2026-07-2217.26m10
2026-07-2113.98m7
2026-07-2017.47m16