Shadow Serpentis 250mm Railgun
FactionMediumShadow Serpentis 250mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
Cruiser-sized large barrel turret. Railguns use magnetic rails to fire solid chunks of matter at hypersonic speed. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
9.46m ISK
90d Avg
17.96m ISK
Volume
10 m³
Base Price
75.0k ISK
Jita Market (90d)
Latest Price (2026-07-02)
9.46m ISK
90d Average
17.96m ISK
90d High
29.63m ISK
90d Low
9.46m ISK
Avg Daily Volume
6
Variations(11)
250mm Railgun I
Tech I
250mm Prototype Gauss Gun
Tech I
250mm 'Scout' Accelerator Cannon
Tech I
250mm Carbide Railgun I
Tech I
250mm Compressed Coil Gun I
Tech I
250mm Railgun II
Tech II
250mm 'Flintlock' Railgun
Storyline
Shadow Serpentis 250mm Railgun
Faction
Dread Guristas 250mm Railgun
Faction
Caldari Navy 250mm Railgun
Faction
Federation Navy 250mm Railgun
Faction
Recent Destructions
View all →Proteus· Imur Xadi · J134702
1.54bProteus· Quiache · J220832
975.88mMyrmidon· ExcelsiorWV · Orvolle
586.54mProteus· Endless Night Sky · J165820
1.43bProteus· PointBlankSniper66 · DS-LO3
1.42bVexor Navy Issue· Kam41rus · Z-SR1I
418.85mProteus· Arthur Lachu · CL-IRS
1.01bVexor Navy Issue· PROPOK · 9DQW-W
266.44mVexor Navy Issue· PROPOK · HZAQ-W
157.00mVexor Navy Issue· PROPOK · Urhinichi
151.12mRequired Skills
Attributes
Activation Cost5.6 GJ
Structure HP40
Powergrid Usage198 MW
CPU Usage42 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID13872
Group ID74
Category ID7
Mass1,000 kg
Volume10 m³
Capacity0.5 m³
Portion Size1
Radius100 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-029.46m6
2026-07-019.49m5
2026-06-3012.47m12
2026-06-2816.41m7
2026-06-2517.65m3
2026-06-2414.93m10
2026-06-2317.65m6
2026-06-2216.88m7
2026-06-2114.92m3
2026-06-2014.93m3
2026-06-1916.71m10
2026-06-1816.91m9
2026-06-1716.97m3
2026-06-1616.00m1
2026-06-1516.00m8
2026-06-1418.26m14
2026-06-1316.01m1
2026-06-1116.00m1
2026-06-0816.00m2
2026-06-0614.90m2
2026-06-0515.75m8
2026-06-0414.45m2
2026-06-0314.36m1
2026-06-0214.69m7
2026-06-0118.88m4
2026-05-3117.45m16
2026-05-3020.95m16
2026-05-2915.21m4
2026-05-2719.27m22
2026-05-2622.72m3