Shadow Serpentis 250mm Railgun
FactionMediumShadow Serpentis 250mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
Cruiser-sized large barrel turret. Railguns use magnetic rails to fire solid chunks of matter at hypersonic speed. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
17.42m ISK
90d Avg
14.84m ISK
Volume
10 m³
Base Price
75.0k ISK
Jita Market (90d)
Latest Price (2026-08-15)
17.42m ISK
90d Average
14.84m ISK
90d High
23.97m ISK
90d Low
4.57m ISK
Avg Daily Volume
7
Variations(11)
250mm Railgun I
Tech I
250mm Prototype Gauss Gun
Tech I
250mm 'Scout' Accelerator Cannon
Tech I
250mm Carbide Railgun I
Tech I
250mm Compressed Coil Gun I
Tech I
250mm Railgun II
Tech II
250mm 'Flintlock' Railgun
Storyline
Shadow Serpentis 250mm Railgun
Faction
Dread Guristas 250mm Railgun
Faction
Caldari Navy 250mm Railgun
Faction
Federation Navy 250mm Railgun
Faction
Recent Destructions
View all →Moa· Puhffy Vinividivici · Dantumi
182.65mRokh· DemHeals Yotosala · Amamake
1.04bTengu· Hiroshima Bob · MY-W1V
1.51bTengu· Hiroshima Bob · 4NDT-W
1.49bProteus· KnightGod117 · X-Z4JW
891.29mProteus· Casey the Wise · C-J6MT
1.70bProteus· PointBlankSniper66 · BX2-ZX
1.72bProteus· Alexis Adhad · PF-346
528.65mProteus· Casey the Wise · Kamio
1.83bVigilant· Malodon · O4T-Z5
510.29mRequired Skills
Attributes
Activation Cost5.6 GJ
Structure HP40
Powergrid Usage198 MW
CPU Usage42 tf
Charge Size2
Charge Group85
Reprocessing Materials
Properties
Type ID13872
Group ID74
Category ID7
Mass1,000 kg
Volume10 m³
Packaged Volume10 m³
Capacity0.5 m³
Portion Size1
Radius100 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1517.42m7
2026-08-1415.90m7
2026-08-1315.69m11
2026-08-1214.66m10
2026-08-1011.05m5
2026-08-0911.50m8
2026-08-0814.46m11
2026-08-0710.17m1
2026-08-0610.17m2
2026-08-0510.04m4
2026-08-0414.41m8
2026-08-038.00m6
2026-08-0115.81m19
2026-07-3113.63m4
2026-07-307.46m1
2026-07-2814.81m7
2026-07-277.36m2
2026-07-2615.29m14
2026-07-2516.02m10
2026-07-2416.00m5
2026-07-2312.47m1
2026-07-2115.90m1
2026-07-1914.52m6
2026-07-1712.94m6
2026-07-1615.92m15
2026-07-1512.72m13
2026-07-134.60m2
2026-07-1112.31m17
2026-07-1016.09m8
2026-07-0914.35m16