Vorton Tuning System II
Tech IIVorton Tuning SystemsVorton Tuning System II — Tech II Vorton Projector Upgrade (Module) — EVE Online item
Fine-tuning of the Arcing Vorton Projector's energy waveforms greatly assists in reducing the waste energy discharges during firing. This has the benefit of boosting damage output and reducing ablation of the ultraconducting nanocabling. The calculations involved are complex but a supplementary Vorton Tuning System provides additional computing capacity.
Grants a bonus to the firing rate and damage of Vorton Projectors.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Grants a bonus to the firing rate and damage of Vorton Projectors.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Jita Price
49.75m ISK
90d Avg
45.84m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-08-13)
49.75m ISK
90d Average
45.84m ISK
90d High
68.80m ISK
90d Low
22.27m ISK
Avg Daily Volume
260
Variations(5)
Recent Destructions
View all →Thunderchild· Crystal en Distel · YXIB-I
2.76bThunderchild· Mrs Arden Valejo · YXIB-I
2.76bThunderchild· Hawkeye girl · YXIB-I
2.76bThunderchild· Hohengrimm · YXIB-I
2.69bSkybreaker· Zigex Strix · AD083
657.14mThunderchild· Akupy · 7-UH4Z
2.62bStormbringer· Dattoh Usiri Itovuo · Niarja
1.28bStormbringer· Sharleen Castle · Oulley
1.26bStormbringer· LucyVanPelt · RNF-YH
1.23bStormbringer· chujunyu · Konola
1.30bRequired Skills
Attributes
Structure HP40
Powergrid Usage1 MW
CPU Usage30 tf
Reprocessing Materials
Properties
Type ID54975
Group ID4067
Category ID7
Volume5 m³
Packaged Volume5 m³
Portion Size1
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1349.75m211
2026-08-1249.87m376
2026-08-1149.89m242
2026-08-1052.95m246
2026-08-0952.50m350
2026-08-0852.00m309
2026-08-0752.00m223
2026-08-0652.98m260
2026-08-0553.00m342
2026-08-0454.97m300
2026-08-0355.41m207
2026-08-0255.89m229
2026-08-0157.70m304
2026-07-3159.60m181
2026-07-3064.81m200
2026-07-2965.86m148
2026-07-2866.84m175
2026-07-2766.79m230
2026-07-2660.65m202
2026-07-2563.90m153
2026-07-2464.00m148
2026-07-2358.90m226
2026-07-2258.75m225
2026-07-2158.00m228
2026-07-2057.40m255
2026-07-1958.98m209
2026-07-1856.32m224
2026-07-1750.99m197
2026-07-1650.50m250
2026-07-1548.90m145