Compact Vorton Tuning System I
Tech IVorton Tuning SystemsCompact Vorton Tuning System I — Tech I Vorton Projector Upgrade (Module) — EVE Online item
Fine-tuning of the Arcing Vorton Projector's energy waveforms greatly assists in reducing the waste energy discharges during firing. This has the benefit of boosting damage output and reducing ablation of the ultraconducting nanocabling. The calculations involved are complex but a supplementary Vorton Tuning System provides additional computing capacity.
Grants a bonus to the firing rate and damage of Vorton Projectors.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Grants a bonus to the firing rate and damage of Vorton Projectors.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Jita Price
23.45m ISK
90d Avg
51.37m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-10-04)
23.45m ISK
90d Average
51.37m ISK
90d High
91.50m ISK
90d Low
23.45m ISK
Avg Daily Volume
3
Variations(5)
Vorton Tuning System I
Tech I
Compact Vorton Tuning System I
Tech I
Vorton Tuning System II
Tech II
Consortium Vorton Tuning System
Faction
Kasiha's Modified Vorton Tuning System
Officer
Recent Destructions
View all →Stormbringer· GhortKlaatu · Deltole
1.59bSkybreaker· MILINT ARC Trooper · Bogelek
858.72mStormbringer· NoMacroNoBrain · AD107
1.24bStormbringer· Hawk Odunen · Frulegur
1.00bSkybreaker· Mius Riyu · Hulm
578.64mStormbringer· Ram Rani · Adiere
466.60mStormbringer· Laeti Swacz · Adiere
466.60mStormbringer· Manir Noud · J133052
523.83mSkybreaker· Teen TM · Huttaken
456.82mThunderchild· Sin Kitty · Maurasi
2.11bRequired Skills
Attributes
Structure HP40
Powergrid Usage1 MW
CPU Usage25 tf
Reprocessing Materials
Properties
Type ID54974
Category ID7
Volume5 m³
Packaged Volume5 m³
Portion Size1
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0423.45m2
2026-10-0353.86m18
2026-09-3050.00m1
2026-09-2950.00m3
2026-09-2691.49m3
2026-09-1930.01m3
2026-09-1870.50m3
2026-09-1659.99m1
2026-09-1059.99m1
2026-09-0830.01m2
2026-09-0391.00m1
2026-09-0286.14m3
2026-08-3052.47m6
2026-08-1730.89m2
2026-08-1659.25m8
2026-08-1450.00m1
2026-08-1350.00m2
2026-08-1248.21m2
2026-08-1048.21m1
2026-08-0748.21m3
2026-07-3145.91m3
2026-07-2645.73m4
2026-07-2445.62m4
2026-07-2344.70m2
2026-07-2143.98m3
2026-07-1945.27m5
2026-07-1832.10m3