Vorton Tuning System I
Tech IVorton Tuning SystemsVorton Tuning System I — Tech I Vorton Projector Upgrade (Module) — EVE Online item
Fine-tuning of the Arcing Vorton Projector's energy waveforms greatly assists in reducing the waste energy discharges during firing. This has the benefit of boosting damage output and reducing ablation of the ultraconducting nanocabling. The calculations involved are complex but a supplementary Vorton Tuning System provides additional computing capacity.
Grants a bonus to the firing rate and damage of Vorton Projectors.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Grants a bonus to the firing rate and damage of Vorton Projectors.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Jita Price
22.27m ISK
90d Avg
27.16m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-10-04)
22.27m ISK
90d Average
27.16m ISK
90d High
46.00m ISK
90d Low
16.85m ISK
Avg Daily Volume
6
Variations(5)
Recent Destructions
View all →Skybreaker· Alexander Minto Hughes · Jita
265.28mStormbringer· BrXe6 · QXE-1N
794.61mStormbringer· Sindey Aegis · AD004
1.07bThunderchild· SpaceKyd · Konora
2.20bStormbringer· Dark blood Disciple · Egbonbet
783.26mSkybreaker· Carth Sheppard · Jita
616.24mThunderchild· Nathan d'Arcy · Amarr
1.44bSkybreaker· Foxys Tail · Jatate
288.42mStormbringer· flying potato mountpotato · WE-KK2
668.00mSkybreaker· Bullgrafari · Amarr
261.25mRequired Skills
Attributes
Structure HP40
Powergrid Usage1 MW
CPU Usage27 tf
Reprocessing Materials
Properties
Type ID54973
Category ID7
Volume5 m³
Packaged Volume5 m³
Portion Size1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0422.27m6
2026-10-0324.00m2
2026-10-0223.07m3
2026-09-3024.90m1
2026-09-2825.00m3
2026-09-2719.64m1
2026-09-2626.00m5
2026-09-2419.61m2
2026-09-2325.90m2
2026-09-2123.41m5
2026-09-1926.09m23
2026-09-1718.00m1
2026-09-1518.05m1
2026-09-1318.01m4
2026-09-1220.03m16
2026-09-1128.29m6
2026-09-1016.85m1
2026-09-0719.18m28
2026-09-0529.52m3
2026-09-0229.25m2
2026-09-0129.50m2
2026-08-3129.43m1
2026-08-3019.00m3
2026-08-2919.05m2
2026-08-2829.58m2
2026-08-2319.03m1
2026-08-2219.04m2
2026-08-1924.52m6
2026-08-1829.93m3
2026-08-1629.90m1