1200mm Artillery Cannon I
Tech ILarge1200mm Artillery Cannon I — Tech I Projectile Weapon (Module) — EVE Online item
One of the most powerful projectile cannons a battleship can equip.
Must be loaded with any of the following projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, or Titanium Sabot.
Must be loaded with any of the following projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, or Titanium Sabot.
Jita Price
1.12m ISK
90d Avg
994.3k ISK
Volume
50 m³
Base Price
1.20m ISK
Jita Market (90d)
Latest Price (2026-10-03)
1.12m ISK
90d Average
994.3k ISK
90d High
1.61m ISK
90d Low
526.6k ISK
Avg Daily Volume
11
Variations(11)
1200mm Artillery Cannon I
Tech I
1200mm Heavy 'Scout' Artillery I
Tech I
1200mm Heavy Carbine Howitzer I
Tech I
1200mm Heavy Gallium Cannon
Tech I
1200mm Heavy Prototype Siege Cannon
Tech I
1200mm Artillery Cannon II
Tech II
1200mm Heavy 'Jolt' Artillery I
Storyline
Domination 1200mm Artillery
Faction
Republic Fleet 1200mm Artillery
Faction
Hakim's Modified 1200mm Artillery Cannon
Officer
Tobias' Modified 1200mm Artillery Cannon
Officer
Recent Destructions
View all →Maelstrom· Leofaschifo · Ofstold
184.71mTornado· Ronaldrump · Frulegur
75.96mTempest Fleet Issue· Magimace · Amamake
650.81mTornado· Couor Hasterze · BG-W90
98.50mScorpion· Jamata Ki Yuso · Jita
147.97mTempest· James Fing Holden · Amamake
204.26mTornado· Nuallan Xadi · PO-3QW
89.31mTornado· CaptainRaD · PO-3QW
89.46mTornado· Nuallan Xadi · PO-3QW
89.49mTornado· Prelude riraillee · Y-YGMW
94.87mRequired Skills
Attributes
Structure HP40
Powergrid Usage2750 MW
CPU Usage42 tf
Charge Size3
Charge Group83
Reprocessing Materials
Properties
Type ID497
Category ID7
Mass2,000 kg
Volume50 m³
Packaged Volume50 m³
Capacity1 m³
Portion Size1
Radius2,000 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-031.12m7
2026-10-011.12m1
2026-09-28538.2k2
2026-09-27647.1k43
2026-09-18535.4k120
2026-09-17535.4k4
2026-09-15702.6k7
2026-09-14827.6k16
2026-09-121.37m2
2026-09-07532.3k4
2026-09-06532.3k10
2026-09-03531.8k7
2026-09-01531.9k6
2026-08-31921.0k14
2026-08-30531.0k6
2026-08-291.25m5
2026-08-281.20m3
2026-08-261.00m1
2026-08-251.19m4
2026-08-22990.0k18
2026-08-171.05m14
2026-08-161.45m6
2026-08-121.57m8
2026-08-031.58m5
2026-08-011.45m17
2026-07-31527.1k8
2026-07-301.58m1
2026-07-261.60m10
2026-07-25526.6k2
2026-07-241.60m1