1200mm Heavy 'Jolt' Artillery I
StorylineLarge1200mm Heavy 'Jolt' Artillery I — Storyline Projectile Weapon (Module) — EVE Online item
Market/Ship Equipment/Turrets & Launchers/Projectile Turrets/Artillery Cannons/1200mm Heavy 'Jolt' Artillery I
One of the most powerful projectile cannons a battleship can equip.
Must be loaded with any of the following projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, or Titanium Sabot.
Must be loaded with any of the following projectile ammo types: Carbonized Lead, Depleted Uranium, EMP, Fusion, Nuclear, Phased Plasma, Proton, or Titanium Sabot.
Jita Price
6.18m ISK
90d Avg
4.00m ISK
Volume
20 m³
Base Price
1.20m ISK
Jita Market (90d)
Latest Price (2026-05-16)
6.18m ISK
90d Average
4.00m ISK
90d High
6.18m ISK
90d Low
1.46m ISK
Avg Daily Volume
6
Variations(11)
1200mm Artillery Cannon I
Tech I
1200mm Heavy 'Scout' Artillery I
Tech I
1200mm Heavy Carbine Howitzer I
Tech I
1200mm Heavy Gallium Cannon
Tech I
1200mm Heavy Prototype Siege Cannon
Tech I
1200mm Artillery Cannon II
Tech II
1200mm Heavy 'Jolt' Artillery I
Storyline
Domination 1200mm Artillery
Faction
Republic Fleet 1200mm Artillery
Faction
Hakim's Modified 1200mm Artillery Cannon
Officer
Tobias' Modified 1200mm Artillery Cannon
Officer
Recent Destructions
View all →Tempest· Legion Getto · X-PQEX
240.13mMachariel· huanying phantom · PR-8CA
1.86bVargur· Ayrton Nakka · J141451
2.06bMachariel· Guo Andy · T8T-RA
1.86bMachariel· XIAN915 · T8T-RA
2.00bMachariel· chengwww · T8T-RA
1.96bMachariel· CELEBRAL PALSY · T8T-RA
1.79bMachariel· xxx-GSL · T8T-RA
1.94bMachariel· xxx-GRL · T8T-RA
1.94bMachariel· xxx-GDL · T8T-RA
1.94bRequired Skills
Attributes
Structure HP40
Powergrid Usage2475 MW
CPU Usage36 tf
Charge Size3
Charge Group83
Reprocessing Materials
Properties
Type ID21559
Group ID55
Category ID7
Mass2,000 kg
Volume20 m³
Capacity1 m³
Portion Size1
Radius2,000 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-166.18m5
2026-05-086.17m12
2026-04-236.06m5
2026-04-222.15m1
2026-04-212.13m2
2026-04-142.00m2
2026-04-124.50m22
2026-04-113.75m7
2026-04-022.00m3
2026-03-134.13m6
2026-03-123.49m5
2026-03-045.39m1