Standup Capacitor Power Relay II
Structure Tech IICapacitor Power RelaysStandup Capacitor Power Relay II — Structure Tech II Structure Capacitor Power Relay (Structure Module) — EVE Online item
Standup Capacitor Power Relay modules increase the capacitor recharge rate of a structure.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
245.30m ISK
90d Avg
110.12m ISK
Volume
4,000 m³
Jita Market (90d)
Latest Price (2026-05-24)
245.30m ISK
90d Average
110.12m ISK
90d High
249.20m ISK
90d Low
52.06m ISK
Avg Daily Volume
3
Variations(2)
Standup Capacitor Power Relay II
Structure Tech II
Standup Capacitor Power Relay I
Structure Tech I
Recent Destructions
View all →Astrahus· Unknown Pilot · I0AB-R
3.19bAstrahus· Unknown Pilot · Ahbazon
3.05bAstrahus· Unknown Pilot · J164342
3.17bAzbel· Unknown Pilot · Pulin
14.98bAzbel· Unknown Pilot · Torrinos
18.51bFortizar· Unknown Pilot · J100015
24.50bAthanor· Unknown Pilot · J130222
8.60bKeepstar· Unknown Pilot · Aunenen
347.67bAstrahus· Unknown Pilot · Neziel
5.53bRaitaru· Unknown Pilot · Ikami
4.95bAttributes
Structure HP40
Powergrid Usage60000 MW
CPU Usage1200 tf
Reprocessing Materials
Properties
Type ID47358
Group ID1967
Category ID66
Mass500 kg
Volume4,000 m³
Portion Size1
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-24245.30m1
2026-05-23102.13m5
2026-05-2275.41m3
2026-05-2181.87m3
2026-05-2088.94m1
2026-05-1988.92m3
2026-05-1888.80m1
2026-05-1784.55m1
2026-05-1684.54m3
2026-05-1488.78m2
2026-05-1288.94m1
2026-05-1188.95m2
2026-05-0868.16m1
2026-05-0688.97m1
2026-05-0588.00m2
2026-04-3081.25m3
2026-04-2987.99m1
2026-04-2888.00m2
2026-04-2088.97m4
2026-04-1688.99m6
2026-04-1588.99m5
2026-04-1389.15m3
2026-04-1289.14m1
2026-04-1189.17m1
2026-04-0983.32m5
2026-04-0897.55m3
2026-04-0460.87m1
2026-04-0388.94m2
2026-04-02118.20m2
2026-03-29125.87m3