Standup Variable Spectrum ECM II

Standup Variable Spectrum ECM II

Structure Tech IIElectronic Counter Measures

Standup Variable Spectrum ECM II — Structure Tech II Structure ECM Battery (Structure Module) — EVE Online item

Market/Structure Equipment/Electronic Warfare/Standup Variable Spectrum ECM II
The Standup Variable Spectrum ECM is an electronic warfare system designed for rapid switching of the sensor spectrum being targeted by jamming pulses. The system uses Standup brand spectrum switching scripts to give structure operators the great flexiblity when using the Variable Spectrum ECM. The system may be installed as a module in Upwell technology structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
65.40m ISK
90d Avg
65.66m ISK
Volume
4,000
Jita Market (90d)
Latest Price (2026-07-06)
65.40m ISK
90d Average
65.66m ISK
90d High
80.98m ISK
90d Low
26.83m ISK
Avg Daily Volume
4
Variations(2)
Standup Variable Spectrum ECM II
Standup Variable Spectrum ECM II
Structure Tech II
Standup Variable Spectrum ECM I
Standup Variable Spectrum ECM I
Structure Tech I
Attributes
Activation Cost3600.0 GJ
Structure HP40
Powergrid Usage60000 MW
CPU Usage4800 tf
Cycle Time20.0s
Charge Size1
Charge Group1,549
Properties
Type ID47338
Group ID1332
Category ID66
Mass500 kg
Volume4,000 m³
Capacity1 m³
Portion Size1
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-0665.40m5
2026-07-0563.03m8
2026-07-0457.84m3
2026-07-0258.64m4
2026-07-0159.98m7
2026-06-3055.48m2
2026-06-2959.97m2
2026-06-2855.49m2
2026-06-2759.98m1
2026-06-2660.58m4
2026-06-2560.02m10
2026-06-2458.98m2
2026-06-2360.96m1
2026-06-2259.59m5
2026-06-2159.65m9
2026-06-2059.92m3
2026-06-1958.29m5
2026-06-1861.88m11
2026-06-1761.84m7
2026-06-1661.54m4
2026-06-1563.03m2
2026-06-1459.00m4
2026-06-1357.45m4
2026-06-1263.90m2
2026-06-1163.90m6
2026-06-1057.37m7
2026-06-0964.27m3
2026-06-0860.79m2
2026-06-0763.04m4
2026-06-0657.21m1