Standup XL Energy Neutralizer II

Standup XL Energy Neutralizer II

Structure Tech IIEnergy Neutralizers

Standup XL Energy Neutralizer II — Structure Tech II Structure Energy Neutralizer (Structure Module) — EVE Online item

Market/Structure Equipment/Engineering Equipment/Standup XL Energy Neutralizer II
The Standup XL Energy Neutralizer is superheavy capacitor warfare device capable of draining the energy reserves of extra-large ships, such as capital ships. The XL Energy Neutralizer is designed to be mounted in structure emplacements and can be installed as a module in Upwell technology structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
290.54m ISK
90d Avg
253.14m ISK
Volume
8,000
Jita Market (90d)
Latest Price (2026-07-01)
290.54m ISK
90d Average
253.14m ISK
90d High
325.00m ISK
90d Low
5.24m ISK
Avg Daily Volume
4
Variations(2)
Standup XL Energy Neutralizer II
Standup XL Energy Neutralizer II
Structure Tech II
Standup XL Energy Neutralizer I
Standup XL Energy Neutralizer I
Structure Tech I
Attributes
Activation Cost6000.0 GJ
Structure HP40
Powergrid Usage240000 MW
CPU Usage1800 tf
Cycle Time30.0s
Properties
Type ID47330
Group ID1329
Category ID66
Mass1,000 kg
Volume8,000 m³
Portion Size1
Meta Level2
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-01290.54m8
2026-06-29289.20m1
2026-06-28224.22m4
2026-06-27290.50m3
2026-06-26290.64m8
2026-06-25290.60m2
2026-06-24290.90m6
2026-06-21285.15m2
2026-06-20273.96m13
2026-06-19119.00m2
2026-06-18250.04m5
2026-06-17229.70m1
2026-06-15246.70m2
2026-06-14262.15m8
2026-06-13263.00m1
2026-06-12156.04m8
2026-06-11249.50m2
2026-06-10249.88m5
2026-06-09249.65m2
2026-06-08249.60m1
2026-06-07249.70m3
2026-06-05249.80m1
2026-06-04239.75m4
2026-06-03249.80m5
2026-06-02249.80m1
2026-06-01249.80m2
2026-05-31249.60m2
2026-05-30249.55m2
2026-05-28237.32m27
2026-05-27249.50m1