Standup M-Set Asteroid Ore Grading Processor I

Standup M-Set Asteroid Ore Grading Processor I

Structure Tech IMedium Structure Resource Processing Rigs

Standup M-Set Asteroid Ore Grading Processor I — Structure Tech I Structure Resource Rig M - Asteroid Ore Reprocessing (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Resource Processing Rigs/Standup M-Set Asteroid Ore Grading Processor I
The Standup M-Set Asteroid Ore Grading Processor I rig provides a means for structure operators to adjust hardware systems involved in reprocessing asteroid ore so as to significantly increase refinery efficiency on Upwell technology structures. This rig improves the refining yield of all Veldspar, Scordite, Pyroxeres, Plagioclase, Omber, Kernite, Jaspet, Hemorphite, Hedbergite, Gneiss, Dark Ochre, Spodumain, Crokite, Bistot, Arkonor, Eifyrium, Mordunium, Ytirium, Ducinium, Griemeer, Kylixium, Nocxite, Ueganite, Hezorime and Mercoxit variants.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
296.85m ISK
90d Avg
300.47m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-16)
296.85m ISK
90d Average
300.47m ISK
90d High
392.10m ISK
90d Low
251.40m ISK
Avg Daily Volume
3
Variations(2)
Standup M-Set Asteroid Ore Grading Processor II
Standup M-Set Asteroid Ore Grading Processor II
Structure Tech II
Standup M-Set Asteroid Ore Grading Processor I
Standup M-Set Asteroid Ore Grading Processor I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-16296.85m4
2026-08-14297.60m1
2026-08-13298.00m2
2026-08-12288.75m4
2026-08-10299.65m4
2026-08-09299.35m2
2026-08-08299.00m1
2026-08-07277.83m6
2026-08-06280.00m3
2026-08-05279.00m1
2026-08-04279.00m1
2026-08-03280.00m1
2026-08-02279.90m1
2026-07-29284.50m2
2026-07-28284.00m1
2026-07-27284.00m2
2026-07-26283.97m3
2026-07-24287.00m2
2026-07-22287.00m1
2026-07-21285.65m2
2026-07-20296.50m2
2026-07-19299.00m1
2026-07-18299.00m2
2026-07-17292.67m3
2026-07-16299.00m1
2026-07-15298.00m1
2026-07-14298.00m1
2026-07-13299.00m1
2026-07-12299.00m2
2026-07-11299.00m2