Standup M-Set Asteroid Ore Grading Processor I
Structure Tech IMedium Structure Resource Processing RigsStandup M-Set Asteroid Ore Grading Processor I — Structure Tech I Structure Resource Rig M - Asteroid Ore Reprocessing (Structure Module) — EVE Online item
Market/Structure Modifications/Structure Resource Processing Rigs/Structure Resource Rig M - Asteroid Ore Reprocessing/Standup M-Set Asteroid Ore Grading Processor I
The Standup M-Set Asteroid Ore Grading Processor I rig provides a means for structure operators to adjust hardware systems involved in reprocessing asteroid ore so as to significantly increase refinery efficiency on Upwell technology structures. This rig improves the refining yield of all Veldspar, Scordite, Pyroxeres, Plagioclase, Omber, Kernite, Jaspet, Hemorphite, Hedbergite, Gneiss, Dark Ochre, Spodumain, Crokite, Bistot, Arkonor, Eifyrium, Mordunium, Ytirium, Ducinium, Griemeer, Kylixium, Nocxite, Ueganite, Hezorime and Mercoxit variants.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
284.00m ISK
90d Avg
296.09m ISK
Volume
10 m³
29th September
Page 1
Ship
Victim
Final Blow
Location
Details
28th September
27th September
26th September
24th September
23rd September
21st September
13th September
11th September
10th September
9th September
6th September
4th September
2nd September
30th August
29th August
23rd August
22nd August
21st August
18th August
17th August
16th August
14th August
13th August
11th August
10th August
9th August
8th August
6th August
5th August
Page 1