Athanor

Athanor

Athanor — Refinery (Structure) — EVE Online item

“Seen thousands of auto miners come and go. Like a bucket quarry in space. Easy to get used to. New tech's more like slicing out a volcano and bringing the whole thing up. Don’t think I’ll ever get used to it.” – Ramon Fulcan, veteran moon-mining engineer

The Athanor Refinery is a medium-sized structure from the Upwell Consortium and specialized for moon-mining and reaction-based industrial operations. The Athanor is the standard refinery in the Upwell Consortium’s line of industrial structures, and is able to use Upwell's Standup Service modules, allowing flexibility and customization of its functions.

This dedicated extraction and refining structure also provides access to Upwell’s M-Set line of rigs designed to improve productivity and optimization of various aspects of chemical reaction and moon-mining operations. The Athanor has docking facilities for subcapital ships and freighters.

The Moon Drill Service Module can only be installed if the Refinery is deployed on the eligible moon mining position.
Jita Price
706.42m ISK
90d Avg
693.75m ISK
Volume
8,000
Jita Market (90d)
Latest Price (2026-07-01)
706.42m ISK
90d Average
693.75m ISK
90d High
774.80m ISK
90d Low
575.40m ISK
Avg Daily Volume
12
Attributes
Structure HP1,200,000
Powergrid Output900000 MW
High Slots1
Med Slots3
Low Slots3
CPU Output14000 tf
Capacitor Recharge3600.0s
Radar Strength350,000
Max Locked Targets8
Shield HP2,400,000
Armor HP1,200,000
Armor EM Resist20.0%
Armor Thermal Resist20.0%
Armor Kinetic Resist20.0%
Armor Explosive Resist20.0%
Shield EM Resist20.0%
Shield Thermal Resist20.0%
Shield Kinetic Resist20.0%
Shield Explosive Resist20.0%
Shield Recharge Time1000000000.0s
Capacitor Capacity100000.0 GJ
Signature Radius50000 m
Max Target Range40 m
Calibration Output400
Rig Slots3
Launcher Hardpoints3
Properties
Type ID35835
Group ID1406
Category ID65
Mass3,000,000,000 kg
Volume8,000 m³
Portion Size1
Radius45,000 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-01706.42m19
2026-06-30681.17m10
2026-06-29705.90m5
2026-06-28716.19m19
2026-06-27713.41m17
2026-06-26717.85m4
2026-06-25698.70m5
2026-06-24702.72m6
2026-06-23704.13m10
2026-06-22719.91m8
2026-06-21719.60m4
2026-06-20697.83m12
2026-06-19702.59m17
2026-06-18679.59m7
2026-06-17692.69m12
2026-06-16667.83m3
2026-06-15707.99m7
2026-06-14700.55m10
2026-06-13697.88m12
2026-06-12700.19m16
2026-06-11682.73m3
2026-06-10665.47m12
2026-06-09694.15m11
2026-06-08700.78m26
2026-06-07686.70m3
2026-06-06688.75m10
2026-06-05659.00m21
2026-06-04697.18m9
2026-06-03666.08m8
2026-06-02701.90m3