Standup M-Set Asteroid Ore Grading Processor II

Standup M-Set Asteroid Ore Grading Processor II

Structure Tech IIMedium Structure Resource Processing Rigs

Standup M-Set Asteroid Ore Grading Processor II — Structure Tech II Structure Resource Rig M - Asteroid Ore Reprocessing (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Resource Processing Rigs/Standup M-Set Asteroid Ore Grading Processor II
The Standup M-Set Asteroid Ore Grading Processor II rig provides a means for structure operators to adjust hardware systems involved in reprocessing asteroid ore so as to significantly increase refinery efficiency on Upwell technology structures. This rig improves the refining yield of all Veldspar, Scordite, Pyroxeres, Plagioclase, Omber, Kernite, Jaspet, Hemorphite, Hedbergite, Gneiss, Dark Ochre, Spodumain, Crokite, Bistot, Arkonor, Eifyrium, Mordunium, Ytirium, Ducinium, Griemeer, Kylixium, Nocxite, Ueganite, Hezorime and Mercoxit variants.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
1.49b ISK
90d Avg
1.28b ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-15)
1.49b ISK
90d Average
1.28b ISK
90d High
1.60b ISK
90d Low
1.01b ISK
Avg Daily Volume
2
Variations(2)
Standup M-Set Asteroid Ore Grading Processor II
Standup M-Set Asteroid Ore Grading Processor II
Structure Tech II
Standup M-Set Asteroid Ore Grading Processor I
Standup M-Set Asteroid Ore Grading Processor I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-151.49b1
2026-08-131.48b1
2026-08-121.33b4
2026-08-111.30b2
2026-08-091.30b2
2026-08-031.26b3
2026-08-021.26b1
2026-08-011.25b1
2026-07-301.60b1
2026-07-261.29b1
2026-07-251.29b1
2026-07-241.02b1
2026-07-211.20b2
2026-07-191.02b1
2026-07-151.20b2
2026-07-131.19b1
2026-07-121.18b1
2026-07-111.20b1
2026-07-091.25b3
2026-07-081.25b1
2026-07-071.27b2
2026-07-061.27b1
2026-07-031.29b2
2026-07-011.29b1
2026-06-301.14b5
2026-06-291.11b1
2026-06-281.06b2
2026-06-261.12b2
2026-06-251.13b1
2026-06-241.16b1