50000MN Cold-Gas Enduring Microwarpdrive
Tech IMicrowarpdrives50000MN Cold-Gas Enduring Microwarpdrive — Tech I Propulsion Module (Module) — EVE Online item
Massive boost to speed for a very short time. The thrust that boosts the ship, and the corresponding maximum velocity bonus, are limited by the mass of the ship that uses this module. The sheer amount of energy needed to power this system means that it must permanently reserve a fraction of the capacitor output just to maintain the integrity of its warp containment field, and when activated it substantially increases the ship's EM footprint.
Penalty: Max capacitor reduced.
Note: May only be fitted to capital class ships.
Penalty: Max capacitor reduced.
Note: May only be fitted to capital class ships.
Jita Price
83.15m ISK
90d Avg
98.73m ISK
Volume
4,000 m³
Base Price
60.00m ISK
Jita Market (90d)
Latest Price (2026-09-29)
83.15m ISK
90d Average
98.73m ISK
90d High
173.75m ISK
90d Low
13.90m ISK
Avg Daily Volume
9
Variations(7)
Recent Destructions
View all →Thanatos· KAI--PvP · J144944
3.45bThanatos· Pepper Zhu · Turnur
3.09bArchon· neg0daj · J140133
3.45bNidhoggur· yuyexf1-1 · 77S8-E
6.32bNidhoggur· Alesiy Ledov · J104617
4.75bNidhoggur· Jhonny's Sister · Ignoitton
5.06bNidhoggur· Dim hit · 16P-PX
5.79bNaglfar· 0Dziurska Wanda · J115041
4.27bPhoenix· Formusa Rabbit · J234152
3.43bArchon· Khaladin Stormblessed · C-J6MT
3.88bRequired Skills
Attributes
Activation Cost7000.0 GJ
Structure HP40
Velocity Modifier505.0%
Powergrid Usage70000 MW
CPU Usage100 tf
Cycle Time20.0s
Signature Radius Modifier500.0%
Reprocessing Materials
Properties
Type ID41252
Category ID7
Mass1,000 kg
Volume4,000 m³
Packaged Volume1,000 m³
Portion Size1
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-09-2983.15m8
2026-09-2889.28m5
2026-09-2768.57m5
2026-09-2681.52m9
2026-09-2587.09m7
2026-09-2479.28m11
2026-09-2389.48m7
2026-09-2289.78m2
2026-09-2186.18m9
2026-09-2078.85m3
2026-09-1990.07m4
2026-09-1890.15m2
2026-09-1790.17m2
2026-09-1690.24m5
2026-09-1584.54m6
2026-09-1488.21m3
2026-09-1388.39m8
2026-09-1289.94m11
2026-09-1184.77m8
2026-09-1090.97m3
2026-09-0986.99m4
2026-09-0891.08m7
2026-09-0791.14m6
2026-09-0687.88m20
2026-09-0578.66m4
2026-09-0488.76m5
2026-09-0393.22m3
2026-09-0289.26m4
2026-09-0185.97m4
2026-08-3185.43m12