50000MN Microwarpdrive I
Tech IMicrowarpdrives50000MN Microwarpdrive I — Tech I Propulsion Module (Module) — EVE Online item
Massive boost to speed for a very short time. The thrust that boosts the ship, and the corresponding maximum velocity bonus, are limited by the mass of the ship that uses this module. The sheer amount of energy needed to power this system means that it must permanently reserve a fraction of the capacitor output just to maintain the integrity of its warp containment field, and when activated it substantially increases the ship's EM footprint.
Penalty: Max capacitor reduced.
Note: May only be fitted to capital class ships.
Penalty: Max capacitor reduced.
Note: May only be fitted to capital class ships.
Jita Price
61.86m ISK
90d Avg
72.16m ISK
Volume
4,000 m³
Base Price
60.00m ISK
Jita Market (90d)
Latest Price (2026-10-01)
61.86m ISK
90d Average
72.16m ISK
90d High
88.56m ISK
90d Low
35.00m ISK
Avg Daily Volume
5
Variations(7)
Recent Destructions
View all →Erebus· GM Wren · Pakhshi
144.05bThanatos· Ulla Vice · 5P-AIP
3.06bNaglfar Fleet Issue· Champagne Love · J131128
7.97bThanatos· The-Realm-of-True-Self · B1D-KU
3.74bNaglfar Fleet Issue· Valar Morg · J103800
6.63bArchon· Blue Falcon13 · J111450
2.88bNidhoggur· UDDHRH-MAMA · D-W7F0
5.39bThanatos· DarkEternal · J124058
3.08bThanatos· 3ye huadong · J120816
2.33bArchon· Alex Empire · J105023
2.75bRequired Skills
Attributes
Activation Cost10000.0 GJ
Structure HP40
Velocity Modifier500.0%
Powergrid Usage70000 MW
CPU Usage100 tf
Cycle Time20.0s
Signature Radius Modifier500.0%
Reprocessing Materials
Properties
Type ID41249
Category ID7
Mass1,000 kg
Volume4,000 m³
Packaged Volume1,000 m³
Portion Size1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0161.86m2
2026-09-3061.91m2
2026-09-2971.66m3
2026-09-2852.04m2
2026-09-2761.96m22
2026-09-2672.80m3
2026-09-2569.23m7
2026-09-2469.68m4
2026-09-2372.81m2
2026-09-2267.79m5
2026-09-2168.76m3
2026-09-2066.69m2
2026-09-1973.28m2
2026-09-1869.12m5
2026-09-1764.93m7
2026-09-1665.72m3
2026-09-1570.00m2
2026-09-1472.22m4
2026-09-1368.19m4
2026-09-1272.09m3
2026-09-1168.67m14
2026-09-1070.63m2
2026-09-0868.44m2
2026-09-0765.58m3
2026-09-0578.68m4
2026-09-0471.33m4
2026-09-0387.60m2
2026-09-0187.78m2
2026-08-3170.72m4
2026-08-3078.52m3