Dual 1000mm Railgun II
Tech IIExtra LargeDual 1000mm Railgun II — Tech II Hybrid Weapon (Module) — EVE Online item
One of the largest weapons currently in existence, this massive railgun is designed for extended sieges of stationary installations and other large targets.
Note: May only be fitted to capital class ships.
Requires either regular or advanced hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium, Javelin, Spike.
Note: May only be fitted to capital class ships.
Requires either regular or advanced hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium, Javelin, Spike.
Jita Price
196.60m ISK
90d Avg
216.55m ISK
Volume
4,000 m³
Base Price
36.29m ISK
Jita Market (90d)
Latest Price (2026-10-11)
196.60m ISK
90d Average
216.55m ISK
90d High
246.10m ISK
90d Low
130.20m ISK
Avg Daily Volume
9
Variations(8)
Dual 1000mm Railgun I
Tech I
Carbide Compact Dual 1000mm Railgun
Tech I
Compressed Enduring Dual 1000mm Railgun
Tech I
Scout Scoped Dual 1000mm Railgun
Tech I
Prototype Precise Dual 1000mm Railgun
Tech I
Dual 1000mm Railgun II
Tech II
CONCORD Dual 1000mm Railgun
Faction
Shadow Serpentis Dual 1000mm Railgun
Faction
Recent Destructions
View all →Erebus· Mr PIPIII · Obe
155.59bErebus· littleguardsman LBLwings · Obe
153.11bMoros· Kirin X make · Obe
4.29bErebus· GaryYYN · Obe
164.24bMoros Navy Issue· F8848N · Obe
4.95bMoros· Dosca No-Donada · Hoshoun
4.36bMoros Navy Issue· Mr Vesuvio · 8F-TK3
5.76bMoros Navy Issue· Zobdemule · 8F-TK3
5.95bMoros Navy Issue· Fresar Ronuken · 8F-TK3
5.78bMoros Navy Issue· xash small · Eifer
5.40bRequired Skills
Attributes
Activation Cost300.0 GJ
Structure HP40
Powergrid Usage121000 MW
CPU Usage127 tf
Charge Size4
Charge Group85
Reprocessing Materials
Properties
Type ID37303
GroupHybrid Weapon (74)
Category ID7
Mass40,000 kg
Volume4,000 m³
Packaged Volume1,000 m³
Capacity10 m³
Portion Size1
Radius1,000 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-11196.60m3
2026-10-10197.45m23
2026-10-09171.00m3
2026-10-08185.25m6
2026-10-07201.10m1
2026-10-06155.50m6
2026-10-05152.87m3
2026-10-04153.03m3
2026-10-03206.80m5
2026-10-01206.78m21
2026-09-30206.87m9
2026-09-29209.16m24
2026-09-28185.42m5
2026-09-27210.30m9
2026-09-26210.60m1
2026-09-25211.22m13
2026-09-22216.35m15
2026-09-20177.27m3
2026-09-16217.54m7
2026-09-15200.97m6
2026-09-14221.22m12
2026-09-13215.72m15
2026-09-11223.63m25
2026-09-10224.00m3
2026-09-08224.78m10
2026-09-07226.50m3
2026-09-06226.75m2
2026-09-05227.46m10
2026-09-01233.47m6
2026-08-31150.30m3