CONCORD Dual 1000mm Railgun
FactionExtra LargeCONCORD Dual 1000mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
One of the largest weapons currently in existence, this massive railgun is designed for extended sieges of stationary installations and other large targets.
Note: May only be fitted to capital class ships.
Requires either regular or advanced hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium, Javelin, Spike.
Note: May only be fitted to capital class ships.
Requires either regular or advanced hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium, Javelin, Spike.
Jita Price
487.42m ISK
90d Avg
606.81m ISK
Volume
4,000 m³
Base Price
46.05m ISK
Jita Market (90d)
Latest Price (2026-07-01)
487.42m ISK
90d Average
606.81m ISK
90d High
1.50b ISK
90d Low
311.20m ISK
Avg Daily Volume
8
Variations(8)
Dual 1000mm Railgun I
Tech I
Carbide Compact Dual 1000mm Railgun
Tech I
Compressed Enduring Dual 1000mm Railgun
Tech I
Scout Scoped Dual 1000mm Railgun
Tech I
Prototype Precise Dual 1000mm Railgun
Tech I
Dual 1000mm Railgun II
Tech II
CONCORD Dual 1000mm Railgun
Faction
Shadow Serpentis Dual 1000mm Railgun
Faction
Recent Destructions
View all →Erebus· Masashi Nunome · Atioth
179.44bErebus· silviu bv · Atioth
178.97bErebus· Greeem Reaper · Atioth
182.14bErebus· The CoomLord · Atioth
178.70bErebus· Damsel In'Distress · Atioth
178.48bErebus· Orc Foxy · Atioth
175.84bErebus· Joe Painter · Atioth
181.13bErebus· Aluminiumminimumimmunity · C-N4OD
181.03bErebus· sakurako · Erila
182.36bMoros Navy Issue· King Amaarian · Mushikegi
12.42bRequired Skills
Attributes
Activation Cost171.4 GJ
Structure HP40
Powergrid Usage121000 MW
CPU Usage104 tf
Charge Size4
Charge Group85
Reprocessing Materials
Properties
Type ID3550
Group ID74
Category ID7
Mass40,000 kg
Volume4,000 m³
Capacity5 m³
Portion Size1
Radius1,000 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-01487.42m6
2026-06-30487.09m8
2026-06-29424.19m14
2026-06-28486.90m2
2026-06-26488.10m6
2026-06-25489.12m5
2026-06-24489.83m6
2026-06-19484.88m12
2026-06-17494.90m2
2026-06-16509.60m1
2026-06-15515.76m13
2026-06-14517.04m8
2026-06-12521.77m6
2026-06-10388.16m16
2026-06-08529.40m6
2026-06-07529.47m6
2026-06-06413.34m7
2026-06-05481.19m17
2026-06-03508.99m7
2026-06-02464.88m4
2026-06-01419.10m2
2026-05-31473.48m9
2026-05-30418.06m7
2026-05-29543.12m18
2026-05-28491.79m7
2026-05-25547.62m5
2026-05-24547.52m6
2026-05-23538.75m12
2026-05-21557.73m6
2026-05-20557.87m13