CONCORD Dual 1000mm Railgun
FactionExtra LargeCONCORD Dual 1000mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
One of the largest weapons currently in existence, this massive railgun is designed for extended sieges of stationary installations and other large targets.
Note: May only be fitted to capital class ships.
Requires either regular or advanced hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium, Javelin, Spike.
Note: May only be fitted to capital class ships.
Requires either regular or advanced hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium, Javelin, Spike.
Jita Price
474.28m ISK
90d Avg
488.08m ISK
Volume
4,000 m³
Base Price
46.05m ISK
Jita Market (90d)
Latest Price (2026-09-28)
474.28m ISK
90d Average
488.08m ISK
90d High
936.45m ISK
90d Low
325.70m ISK
Avg Daily Volume
7
Variations(8)
Dual 1000mm Railgun I
Tech I
Carbide Compact Dual 1000mm Railgun
Tech I
Compressed Enduring Dual 1000mm Railgun
Tech I
Scout Scoped Dual 1000mm Railgun
Tech I
Prototype Precise Dual 1000mm Railgun
Tech I
Dual 1000mm Railgun II
Tech II
CONCORD Dual 1000mm Railgun
Faction
Shadow Serpentis Dual 1000mm Railgun
Faction
Recent Destructions
View all →Moros Navy Issue· Parkuras · Pout
9.35bErebus· Masashi Nunome · Atioth
179.44bErebus· silviu bv · Atioth
178.97bErebus· Greeem Reaper · Atioth
182.14bErebus· The CoomLord · Atioth
178.70bErebus· Damsel In'Distress · Atioth
178.48bErebus· Orc Foxy · Atioth
175.84bErebus· Joe Painter · Atioth
181.13bErebus· Aluminiumminimumimmunity · C-N4OD
181.03bErebus· sakurako · Erila
182.36bRequired Skills
Attributes
Activation Cost171.4 GJ
Structure HP40
Powergrid Usage121000 MW
CPU Usage104 tf
Charge Size4
Charge Group85
Reprocessing Materials
Properties
Type ID3550
GroupHybrid Weapon (74)
Category ID7
Mass40,000 kg
Volume4,000 m³
Packaged Volume1,000 m³
Capacity5 m³
Portion Size1
Radius1,000 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-09-28474.28m6
2026-09-26446.24m18
2026-09-25473.90m1
2026-09-23475.07m4
2026-09-19452.63m17
2026-09-17476.28m9
2026-09-15476.80m4
2026-09-13467.79m15
2026-09-12478.29m7
2026-09-10509.12m6
2026-09-09428.35m4
2026-09-05908.70m1
2026-09-04926.80m2
2026-09-03426.01m9
2026-09-02935.95m11
2026-09-01521.54m5
2026-08-31519.58m6
2026-08-30519.27m12
2026-08-28498.84m9
2026-08-27492.38m6
2026-08-25457.88m19
2026-08-24438.49m12
2026-08-23400.05m2
2026-08-20438.60m3
2026-08-18469.25m6
2026-08-12458.01m12
2026-08-11448.68m6
2026-08-09448.62m6
2026-08-06448.88m6
2026-08-05376.23m4