Dread Guristas Phase Inversion Battery
FactionElectronic Warfare BatteriesDread Guristas Phase Inversion Battery — Faction Electronic Warfare Battery (Starbase) — EVE Online item
Market/Structures/Starbase Structures/Electronic Warfare Battery/Dread Guristas Phase Inversion Battery
Analyzes incoming targeting signals and attempts to counter them by emitting an out-of-phase signal back. Great against Ladar targeting systems.
Jita Price
21.59m ISK
90d Avg
16.07m ISK
Volume
4,000 m³
Base Price
2.50m ISK
Jita Market (90d)
Latest Price (2026-08-20)
21.59m ISK
90d Average
16.07m ISK
90d High
28.00m ISK
90d Low
213.6k ISK
Avg Daily Volume
4
Variations(3)
Phase Inversion Battery
Tech I
Guristas Phase Inversion Battery
Faction
Dread Guristas Phase Inversion Battery
Faction
Recent Destructions
View all →Dread Guristas Phase Inversion Battery· Unknown Pilot · J154824
21.65mDread Guristas Phase Inversion Battery· Unknown Pilot · J154824
21.65mDread Guristas Phase Inversion Battery· Unknown Pilot · PVH8-0
18.59mDread Guristas Phase Inversion Battery· Unknown Pilot · PVH8-0
18.59mDread Guristas Phase Inversion Battery· Unknown Pilot · J114518
7.16mDread Guristas Phase Inversion Battery· Unknown Pilot · J114518
7.16mDread Guristas Phase Inversion Battery· Unknown Pilot · K-6K16
63.20mDread Guristas Phase Inversion Battery· Unknown Pilot · K-6K16
67.84mDread Guristas Phase Inversion Battery· Unknown Pilot · Amamake
74.33mDread Guristas Phase Inversion Battery· Unknown Pilot · Amamake
74.33mRequired Skills
AnchoringIII
Attributes
Structure HP100,000
Powergrid Usage20000 MW
CPU Usage50 tf
Cycle Time7.5s
Radar Strength500,000
Max Locked Targets1
Shield HP200,000
Armor HP3,000,000
Shield Recharge Time20000.0s
Signature Radius8000 m
Max Target Range60 m
Reprocessing Materials
Properties
Type ID27579
Category ID23
Mass100,000,000 kg
Volume4,000 m³
Packaged Volume4,000 m³
Portion Size1
Radius629 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-2021.59m4
2026-08-189.03m2
2026-08-1721.97m1
2026-08-1021.65m3
2026-08-0921.00m2
2026-08-0620.92m13
2026-08-0218.59m12
2026-07-309.05m2
2026-07-0920.21m2
2026-07-087.50m3
2026-07-077.50m1
2026-07-0517.22m2
2026-07-0321.55m8
2026-06-057.16m4