Phase Inversion Battery
Tech IElectronic Warfare BatteriesPhase Inversion Battery — Tech I Electronic Warfare Battery (Starbase) — EVE Online item
Analyzes incoming targeting signals and attempts to counter them by emitting an out-of-phase signal back. Great against Ladar targeting systems.
Jita Price
4.10m ISK
90d Avg
5.39m ISK
Volume
4,000 m³
Base Price
2.50m ISK
Jita Market (90d)
Latest Price (2026-08-16)
4.10m ISK
90d Average
5.39m ISK
90d High
10.87m ISK
90d Low
3.51m ISK
Avg Daily Volume
7
Variations(3)
Phase Inversion Battery
Tech I
Guristas Phase Inversion Battery
Faction
Dread Guristas Phase Inversion Battery
Faction
Recent Destructions
View all →Phase Inversion Battery· Unknown Pilot · J114719
4.30mPhase Inversion Battery· Unknown Pilot · 430-BE
3.84mPhase Inversion Battery· Unknown Pilot · 430-BE
3.84mPhase Inversion Battery· Unknown Pilot · 430-BE
3.84mPhase Inversion Battery· Unknown Pilot · 430-BE
3.84mPhase Inversion Battery· Unknown Pilot · 430-BE
3.84mPhase Inversion Battery· Unknown Pilot · Isbrabata
4.61mPhase Inversion Battery· Unknown Pilot · Isbrabata
4.61mPhase Inversion Battery· Unknown Pilot · Isbrabata
4.61mPhase Inversion Battery· Unknown Pilot · Isbrabata
4.61mRequired Skills
AnchoringIII
Attributes
Structure HP100,000
Powergrid Usage25000 MW
CPU Usage50 tf
Cycle Time7.5s
Radar Strength500,000
Max Locked Targets1
Shield HP100,000
Armor HP1,500,000
Shield Recharge Time10000.0s
Signature Radius8000 m
Max Target Range50 m
Reprocessing Materials
Properties
Type ID17175
Group ID439
Category ID23
Mass100,000,000 kg
Volume4,000 m³
Packaged Volume4,000 m³
Portion Size1
Radius629 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-164.10m12
2026-08-154.20m10
2026-08-143.80m2
2026-08-134.05m6
2026-08-114.30m7
2026-08-093.84m15
2026-08-084.40m6
2026-08-074.16m10
2026-08-064.30m9
2026-08-053.98m13
2026-08-044.20m1
2026-08-034.13m8
2026-08-024.00m6
2026-08-014.61m7
2026-07-313.69m14
2026-07-304.26m5
2026-07-294.59m10
2026-07-286.00m2
2026-07-276.93m2
2026-07-265.00m12
2026-07-256.85m7
2026-07-245.20m12
2026-07-236.27m10
2026-07-226.96m5
2026-07-216.96m9
2026-07-205.05m7
2026-07-193.60m3
2026-07-186.99m1
2026-07-177.08m5
2026-07-167.08m4