Dread Guristas Ion Field Projection Battery
FactionElectronic Warfare BatteriesDread Guristas Ion Field Projection Battery — Faction Electronic Warfare Battery (Starbase) — EVE Online item
Projects a low intensity field of ionized particles to disrupt the effectivenes of enemy sensors. Very effective against Magnetometric-based sensors.
Jita Price
18.97m ISK
90d Avg
20.54m ISK
Volume
4,000 m³
Base Price
2.50m ISK
Jita Market (90d)
Latest Price (2026-07-03)
18.97m ISK
90d Average
20.54m ISK
90d High
25.00m ISK
90d Low
124.8k ISK
Avg Daily Volume
3
Variations(3)
Ion Field Projection Battery
Tech I
Guristas Ion Field Projection Battery
Faction
Dread Guristas Ion Field Projection Battery
Faction
Recent Destructions
View all →Dread Guristas Ion Field Projection Battery· Unknown Pilot · J114518
17.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · J154824
17.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · J154824
17.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · J154824
17.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · J145555
23.29mDread Guristas Ion Field Projection Battery· Unknown Pilot · J145555
23.29mDread Guristas Ion Field Projection Battery· Unknown Pilot · J140521
34.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · J140521
34.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · K-6K16
34.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · K-6K16
14.99mRequired Skills
AnchoringIII
Attributes
Structure HP100,000
Powergrid Usage20000 MW
CPU Usage50 tf
Cycle Time7.5s
Radar Strength500,000
Max Locked Targets1
Shield HP200,000
Armor HP3,000,000
Shield Recharge Time20000.0s
Signature Radius8000 m
Max Target Range60 m
Reprocessing Materials
Properties
Type ID27576
Group ID439
Category ID23
Mass100,000,000 kg
Volume4,000 m³
Portion Size1
Radius629 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-0318.97m8
2026-06-1917.00m2
2026-06-052.91m4
2026-05-3023.20m1
2026-05-2123.29m1
2026-05-2024.26m5
2026-05-1424.27m1
2026-05-0924.28m1
2026-05-0624.28m2
2026-05-0224.11m8
2026-04-2524.40m2
2026-04-1925.00m5
2026-04-1011.11m3