Dread Guristas Ion Field Projection Battery
FactionElectronic Warfare BatteriesDread Guristas Ion Field Projection Battery — Faction Electronic Warfare Battery (Starbase) — EVE Online item
Projects a low intensity field of ionized particles to disrupt the effectivenes of enemy sensors. Very effective against Magnetometric-based sensors.
Jita Price
17.00m ISK
90d Avg
14.74m ISK
Volume
4,000 m³
Base Price
2.50m ISK
Jita Market (90d)
Latest Price (2026-08-17)
17.00m ISK
90d Average
14.74m ISK
90d High
23.20m ISK
90d Low
124.8k ISK
Avg Daily Volume
4
Variations(3)
Ion Field Projection Battery
Tech I
Guristas Ion Field Projection Battery
Faction
Dread Guristas Ion Field Projection Battery
Faction
Recent Destructions
View all →Dread Guristas Ion Field Projection Battery· Unknown Pilot · PVH8-0
12.45mDread Guristas Ion Field Projection Battery· Unknown Pilot · PVH8-0
12.45mDread Guristas Ion Field Projection Battery· Unknown Pilot · J114518
17.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · J154824
17.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · J154824
17.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · J154824
17.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · J145555
23.29mDread Guristas Ion Field Projection Battery· Unknown Pilot · J145555
23.29mDread Guristas Ion Field Projection Battery· Unknown Pilot · J140521
34.00mDread Guristas Ion Field Projection Battery· Unknown Pilot · J140521
34.00mRequired Skills
AnchoringIII
Attributes
Structure HP100,000
Powergrid Usage20000 MW
CPU Usage50 tf
Cycle Time7.5s
Radar Strength500,000
Max Locked Targets1
Shield HP200,000
Armor HP3,000,000
Shield Recharge Time20000.0s
Signature Radius8000 m
Max Target Range60 m
Reprocessing Materials
Properties
Type ID27576
Group ID439
Category ID23
Mass100,000,000 kg
Volume4,000 m³
Packaged Volume4,000 m³
Portion Size1
Radius629 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1717.00m6
2026-08-1016.98m2
2026-08-0916.84m2
2026-08-0212.45m20
2026-08-0111.97m1
2026-07-217.73m1
2026-07-0917.11m2
2026-07-0318.97m8
2026-06-1917.00m2
2026-06-052.91m4
2026-05-3023.20m1