Ion Field Projection Battery
Tech IElectronic Warfare BatteriesIon Field Projection Battery — Tech I Electronic Warfare Battery (Starbase) — EVE Online item
Projects a low intensity field of ionized particles to disrupt the effectivenes of enemy sensors. Very effective against Magnetometric-based sensors.
Jita Price
5.49m ISK
90d Avg
4.57m ISK
Volume
4,000 m³
Base Price
2.50m ISK
Jita Market (90d)
Latest Price (2026-10-03)
5.49m ISK
90d Average
4.57m ISK
90d High
9.44m ISK
90d Low
2.61m ISK
Avg Daily Volume
8
Variations(3)
Ion Field Projection Battery
Tech I
Guristas Ion Field Projection Battery
Faction
Dread Guristas Ion Field Projection Battery
Faction
Recent Destructions
View all →Ion Field Projection Battery· Unknown Pilot · J143918
9.43mIon Field Projection Battery· Unknown Pilot · J143918
9.43mIon Field Projection Battery· Unknown Pilot · J103217
5.67mIon Field Projection Battery· Unknown Pilot · J131505
9.44mIon Field Projection Battery· Unknown Pilot · J131505
9.44mIon Field Projection Battery· Unknown Pilot · J131505
9.44mIon Field Projection Battery· Unknown Pilot · J103217
3.46mIon Field Projection Battery· Unknown Pilot · Lirerim
3.46mIon Field Projection Battery· Unknown Pilot · HBD-CC
3.46mIon Field Projection Battery· Unknown Pilot · HBD-CC
3.46mRequired Skills
AnchoringIII
Attributes
Structure HP100,000
Powergrid Usage25000 MW
CPU Usage50 tf
Cycle Time7.5s
Radar Strength500,000
Max Locked Targets1
Shield HP100,000
Armor HP1,500,000
Shield Recharge Time10000.0s
Signature Radius8000 m
Max Target Range50 m
Reprocessing Materials
Properties
Type ID17174
Category ID23
Mass100,000,000 kg
Volume4,000 m³
Packaged Volume4,000 m³
Portion Size1
Radius629 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-035.49m1
2026-10-025.49m9
2026-10-015.50m1
2026-09-307.04m6
2026-09-298.75m9
2026-09-288.92m26
2026-09-279.43m18
2026-09-265.64m6
2026-09-255.67m7
2026-09-249.44m1
2026-09-234.60m2
2026-09-224.65m10
2026-09-214.60m1
2026-09-203.46m5
2026-09-195.35m5
2026-09-185.96m1
2026-09-175.96m5
2026-09-165.00m20
2026-09-154.44m2
2026-09-134.32m14
2026-09-124.44m5
2026-09-114.44m3
2026-09-104.44m2
2026-09-093.82m20
2026-09-064.00m5
2026-09-054.44m5
2026-09-043.21m15
2026-09-033.46m13
2026-09-024.14m7
2026-09-012.75m2