Large Beam Laser Battery
Tech ILaser BatteriesLarge Beam Laser Battery — Tech I Mobile Laser Sentry (Starbase) — EVE Online item
Fires a deep modulated energy beam using extra large sized frequency crystals at those the Control Tower deems its enemies. Effective at very long ranges, but tracks slowly and has a low rate of fire. Note: Placing a new type of crystal into the crystal compartment will result in the destruction of the crystal being replaced.
Jita Price
1.57m ISK
90d Avg
15.34m ISK
Volume
5,000 m³
Base Price
12.50m ISK
Jita Market (90d)
Latest Price (2026-05-26)
1.57m ISK
90d Average
15.34m ISK
90d High
25.96m ISK
90d Low
1.50m ISK
Avg Daily Volume
4
Variations(5)
Recent Destructions
View all →Large Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.94mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.94mRequired Skills
Attributes
Structure HP100,000
Powergrid Usage450000 MW
Radar Strength500,000
Charge Size4
Max Locked Targets1
Shield HP100,000
Armor HP1,500,000
Shield Recharge Time10000.0s
Signature Radius18000 m
Max Target Range35 m
Charge Group86
Reprocessing Materials
Properties
Type ID16694
Group ID430
Category ID23
Mass100,000,000 kg
Volume5,000 m³
Capacity1 m³
Portion Size1
Radius400 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-261.57m1
2026-05-2517.98m14
2026-05-2417.98m4
2026-05-201.54m3
2026-05-1817.96m3
2026-05-1717.94m9
2026-05-151.54m8
2026-05-1017.98m1
2026-05-0717.97m9
2026-05-0617.97m2
2026-05-0117.98m1
2026-04-3017.86m3
2026-04-2317.99m14
2026-04-2216.98m4
2026-04-2115.97m3
2026-04-2012.36m8
2026-04-181.51m1
2026-04-1714.99m6
2026-04-1614.99m13
2026-04-128.31m5
2026-04-1112.00m1
2026-04-0515.00m1
2026-04-0412.00m2
2026-04-0315.97m1
2026-04-0215.62m4
2026-03-3112.00m4
2026-03-3014.80m5
2026-03-2912.17m3
2026-03-2815.96m2
2026-03-2715.95m2