Large Beam Laser Battery
Tech ILaser BatteriesLarge Beam Laser Battery — Tech I Mobile Laser Sentry (Starbase) — EVE Online item
Fires a deep modulated energy beam using extra large sized frequency crystals at those the Control Tower deems its enemies. Effective at very long ranges, but tracks slowly and has a low rate of fire. Note: Placing a new type of crystal into the crystal compartment will result in the destruction of the crystal being replaced.
Jita Price
17.97m ISK
90d Avg
14.31m ISK
Volume
5,000 m³
Base Price
12.50m ISK
Jita Market (90d)
Latest Price (2026-07-11)
17.97m ISK
90d Average
14.31m ISK
90d High
17.99m ISK
90d Low
1.51m ISK
Avg Daily Volume
5
Variations(5)
Recent Destructions
View all →Large Beam Laser Battery· Unknown Pilot · J113647
1.57mLarge Beam Laser Battery· Unknown Pilot · W-XY4J
1.57mLarge Beam Laser Battery· Unknown Pilot · W-XY4J
1.57mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mLarge Beam Laser Battery· Unknown Pilot · Y-RAW3
17.96mRequired Skills
Attributes
Structure HP100,000
Powergrid Usage450000 MW
Radar Strength500,000
Charge Size4
Max Locked Targets1
Shield HP100,000
Armor HP1,500,000
Shield Recharge Time10000.0s
Signature Radius18000 m
Max Target Range35 m
Charge Group86
Reprocessing Materials
Properties
Type ID16694
Group ID430
Category ID23
Mass100,000,000 kg
Volume5,000 m³
Capacity1 m³
Portion Size1
Radius400 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-1117.97m2
2026-07-101.84m2
2026-07-0817.98m12
2026-07-0717.97m2
2026-07-0117.95m5
2026-06-2717.90m2
2026-06-2417.98m2
2026-06-231.89m6
2026-06-2117.90m13
2026-06-2017.52m3
2026-06-0417.83m2
2026-06-0317.82m1
2026-05-261.57m1
2026-05-2517.98m14
2026-05-2417.98m4
2026-05-201.54m3
2026-05-1817.96m3
2026-05-1717.94m9
2026-05-151.54m8
2026-05-1017.98m1
2026-05-0717.97m9
2026-05-0617.97m2
2026-05-0117.98m1
2026-04-3017.86m3
2026-04-2317.99m14
2026-04-2216.98m4
2026-04-2115.97m3
2026-04-2012.36m8
2026-04-181.51m1
2026-04-1714.99m6