Caldari Navy Missile Guidance Computer
FactionMissile Guidance ComputersCaldari Navy Missile Guidance Computer — Faction Missile Guidance Computer (Module) — EVE Online item
Market/Ship Equipment/Turrets & Launchers/Missile Guidance Computer/Caldari Navy Missile Guidance Computer
By predicting the trajectory of targets, it helps to boost the precision and range of missiles. This module can be loaded with scripts to increase its effectiveness in certain areas.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Jita Price
303.44m ISK
90d Avg
337.69m ISK
Volume
5 m³
Base Price
9.9k ISK
Jita Market (90d)
Latest Price (2026-09-20)
303.44m ISK
90d Average
337.69m ISK
90d High
599.90m ISK
90d Low
80.02m ISK
Avg Daily Volume
7
Variations(5)
Missile Guidance Computer I
Tech I
Astro-Inertial Compact Missile Guidance Computer
Tech I
Missile Guidance Computer II
Tech II
Caldari Navy Missile Guidance Computer
Faction
Republic Fleet Missile Guidance Computer
Faction
Recent Destructions
View all →Barghest· Tyffanny · UALX-3
4.18bTengu· pingtouge666 · 4GYV-Q
2.16bWidow· Ronni Pedersen · Y-2ANO
1.90bTengu· pingtouge666 · UH-9ZG
2.21bTengu· Ayrton Nakka · J141451
1.77bMarshal· Alarak01 · D-0UI0
13.08bWidow· Ronni Pedersen · Y-2ANO
2.25bGolem· Oganima Inkunen · J134618
4.83bWidow· KafuuChino Alice · WVMS-X
4.75bMarshal· Alarak Antollare · LT-XI4
15.86bRequired Skills
Attributes
Activation Cost7.0 GJ
Structure HP40
Powergrid Usage1 MW
CPU Usage28 tf
Cycle Time10.0s
Charge Size1
Charge Group1,400
Reprocessing Materials
Properties
Type ID94063
Category ID7
Volume5 m³
Packaged Volume5 m³
Capacity1 m³
Portion Size1
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-09-20303.44m12
2026-09-19303.74m13
2026-09-18299.62m16
2026-09-17312.98m6
2026-09-16290.71m9
2026-09-15333.55m11
2026-09-14346.47m3
2026-09-13327.33m6
2026-09-12315.74m9
2026-09-11397.35m6
2026-09-10406.10m3
2026-09-09258.10m1
2026-09-08414.83m3
2026-09-07491.98m5
2026-09-06409.86m11
2026-09-05370.43m10
2026-09-04322.29m15
2026-09-03355.00m6
2026-09-02301.40m1
2026-09-01340.38m5
2026-08-31400.99m8
2026-08-30351.87m13
2026-08-29283.70m10
2026-08-28291.01m8
2026-08-27289.50m2
2026-08-26276.20m9
2026-08-25275.26m7
2026-08-24272.41m10
2026-08-23269.54m11
2026-08-22271.70m6