Mobile Phase Anchor
Tech IMobile Phase AnchorsMobile Phase Anchor — Tech I Mobile Phase Anchor (Deployable) — EVE Online item
Once activated by connected industrial command ships, this deployable device resonates with the closest Phased Asteroid. This causes "Phased-Out" asteroids to phase into harmony with the surrounding spacetime, causing them to become "Phased-In".
While Phased-In, a Phased Asteroid can be mined with far greater efficiency.
Visit the User Manual tab for more information
While Phased-In, a Phased Asteroid can be mined with far greater efficiency.
Visit the User Manual tab for more information
Jita Price
4.75m ISK
90d Avg
5.39m ISK
Volume
50 m³
Base Price
5.00m ISK
Jita Market (90d)
Latest Price (2026-05-17)
4.75m ISK
90d Average
5.39m ISK
90d High
6.59m ISK
90d Low
1 ISK
Avg Daily Volume
16
Recent Destructions
View all →Mobile Phase Anchor· gosalra · T-ZWA1
4.75mMobile Phase Anchor· Lis Maricadie · G-VFVB
4.75mMobile Phase Anchor· Tsunderman Valkyrie · Arton
5.65mMobile Phase Anchor· Brutor Chris · SD4A-2
5.65mMobile Phase Anchor· Xygss Elusive · SY0W-2
5.97mMobile Phase Anchor· Caroline Flying · T-ZWA1
5.65mMobile Phase Anchor· Xygss Elusive · T-ZWA1
5.65mMobile Phase Anchor· Wallace Warcry · T-ZWA1
5.65mMobile Phase Anchor· vanek s · AGG-NR
4.86mMobile Phase Anchor· Mr. Burke · 39P-1J
4.86mRequired Skills
AnchoringIII
Attributes
Structure HP10,000
Shield HP30,000
Armor HP10,000
Armor EM Resist0.0%
Armor Thermal Resist0.0%
Armor Kinetic Resist0.0%
Armor Explosive Resist0.0%
Shield EM Resist75.0%
Shield Thermal Resist75.0%
Shield Kinetic Resist75.0%
Shield Explosive Resist75.0%
Shield Recharge Time86400.0s
Signature Radius1000 m
Reprocessing Materials
Properties
Type ID90037
Group ID4913
Category ID22
Mass10,000 kg
Volume50 m³
Portion Size1
Radius50 m
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-174.75m4
2026-05-165.50m2
2026-05-145.65m15
2026-05-135.57m5
2026-05-125.00m6
2026-05-115.95m1
2026-05-103.67m3
2026-05-091.70m7
2026-05-081.88m19
2026-05-075.96m1
2026-05-045.96m26
2026-05-035.70m5
2026-05-025.97m4
2026-05-014.39m41
2026-04-295.65m8
2026-04-284.86m4
2026-04-275.90m12
2026-04-265.70m23
2026-04-255.30m6
2026-04-243.85m1
2026-04-225.97m15
2026-04-214.64m5
2026-04-205.45m5
2026-04-185.97m28
2026-04-165.55m5
2026-04-155.98m8
2026-04-144.79m12
2026-04-134.99m2
2026-04-125.50m14
2026-04-114.18m6