Industrial Jump Portal Generator I
Jump Portal GeneratorsIndustrial Jump Portal Generator I — Industrial Jump Portal Generator (Module) — EVE Online item
Market/Ship Equipment/Fleet Assistance Modules/Industrial Jump Portal Generator/Industrial Jump Portal Generator I
A piece of machinery that allows an industrial capital ship to create a bridge between systems without the use of a stargate, allowing its companion vessels to travel across vast tracts of space to join it on the battlefield.
Note: Can only be fitted to Rorqual.
Jump Portal Generators use the same isotopes as your ship's jump drive to jump other ships through the portal. You will need sufficient fuel in your holds in order to allow ships in your fleet to use the jump portal when it is activated.
Note: Can only be fitted to Rorqual.
Jump Portal Generators use the same isotopes as your ship's jump drive to jump other ships through the portal. You will need sufficient fuel in your holds in order to allow ships in your fleet to use the jump portal when it is activated.
Jita Price
609.28m ISK
90d Avg
693.49m ISK
Volume
5,000 m³
Base Price
500.00m ISK
Jita Market (90d)
Latest Price (2026-10-11)
609.28m ISK
90d Average
693.49m ISK
90d High
846.60m ISK
90d Low
401.40m ISK
Avg Daily Volume
5
Recent Destructions
View all →Rorqual· Edward Mocha · WLAR-J
9.14bRorqual· happy work · R-P7KL
7.14bRorqual· Elliemental · UYU-VV
6.80bRorqual· Han Wesson · TFA0-U
12.97bRorqual· Melchezdek Alpha · 7G-H7D
7.61bRorqual· OreBorn0 · Soza
6.12bRorqual· BadMoris · Soza
7.23bRorqual· lingyao857 · 1-SMEB
12.71bRorqual· JACKTTFE12 · KX-2UI
8.29bRorqual· Pafoss · Z-2Y2Y
6.06bRequired Skills
Attributes
Activation Cost100.0 GJ
Structure HP99,999
Velocity Modifier-100.0%
Powergrid Usage40000 MW
CPU Usage100 tf
Cycle Time20.0s
Reprocessing Materials
Properties
Type ID63140
Category ID7
Mass1 kg
Volume5,000 m³
Packaged Volume5,000 m³
Portion Size1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-11609.28m5
2026-10-10637.80m5
2026-10-09613.43m3
2026-10-08600.30m2
2026-10-07620.00m1
2026-10-05594.10m9
2026-10-04611.83m3
2026-10-03622.56m5
2026-10-02617.23m4
2026-10-01639.46m7
2026-09-30619.95m2
2026-09-29638.38m5
2026-09-28622.68m9
2026-09-27624.65m4
2026-09-26583.58m4
2026-09-25596.78m9
2026-09-24643.53m6
2026-09-23643.70m2
2026-09-22643.08m5
2026-09-20644.50m2
2026-09-19581.50m1
2026-09-18647.83m3
2026-09-17648.08m4
2026-09-16648.25m2
2026-09-15638.25m2
2026-09-14647.59m7
2026-09-13624.50m3
2026-09-12647.15m14
2026-09-11640.10m5
2026-09-10648.95m2