Capital Moon Ore Compressor I
Capital Moon Ore Compressor I — Compressors (Module) — EVE Online item
This module uses ORE's latest materials compression technology to enable compression of harvested moon ore by a ship operating with an industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Jita Price
153.54m ISK
90d Avg
160.84m ISK
Volume
2,000 m³
Base Price
121.00m ISK
Jita Market (90d)
Latest Price (2026-08-16)
153.54m ISK
90d Average
160.84m ISK
90d High
199.80m ISK
90d Low
105.90m ISK
Avg Daily Volume
3
Recent Destructions
View all →Rorqual· Xing kaos · QFF-O6
8.94bRorqual· Cobalt Ongrard · IR-WT1
9.09bRorqual· happy work · R-P7KL
8.73bRorqual· Knoer · G96R-F
5.99bRorqual· Spite4U · 49-0LI
7.38bRorqual· Akupy · KRUN-N
7.08bRorqual· Otsaras Momaki · DG-8VJ
5.53bRorqual· YetAnotherQD · LS9B-9
7.28bRorqual· Elias zecos-sempay · NCGR-Q
7.95bRorqual· Szacun TES · 3Q-VZA
7.29bRequired Skills
Attributes
Activation Cost1500.0 GJ
Structure HP40
Powergrid Usage100000 MW
CPU Usage50 tf
Cycle Time60.0s
Reprocessing Materials
Properties
Type ID62636
Group ID4174
Category ID7
Volume2,000 m³
Packaged Volume2,000 m³
Portion Size1
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-16153.54m5
2026-08-15144.53m3
2026-08-14145.97m3
2026-08-13148.05m4
2026-08-12153.63m3
2026-08-11139.15m2
2026-08-10139.15m2
2026-08-09144.77m3
2026-08-08146.82m4
2026-08-07153.15m2
2026-08-06152.56m10
2026-08-05152.80m1
2026-08-04153.28m4
2026-08-02128.00m1
2026-08-01140.95m4
2026-07-31154.05m2
2026-07-30147.70m4
2026-07-29127.80m1
2026-07-27147.33m3
2026-07-26154.45m2
2026-07-25154.40m1
2026-07-24126.47m3
2026-07-23152.25m2
2026-07-22148.70m1
2026-07-21149.80m2
2026-07-20138.38m4
2026-07-19155.80m1
2026-07-18157.50m2
2026-07-16135.55m2
2026-07-15147.15m4