Capital Moon Ore Compressor I
Capital Moon Ore Compressor I — Compressors (Module) — EVE Online item
This module uses ORE's latest materials compression technology to enable compression of harvested moon ore by a ship operating with an industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Jita Price
151.47m ISK
90d Avg
152.20m ISK
Volume
2,000 m³
Base Price
121.00m ISK
Jita Market (90d)
Latest Price (2026-05-18)
151.47m ISK
90d Average
152.20m ISK
90d High
173.70m ISK
90d Low
35.70m ISK
Avg Daily Volume
3
Recent Destructions
View all →Rorqual· KiloWattson · 313I-B
7.01bRorqual· Sab II · BOE7-P
6.31bRorqual· Banahe Badasaz · Maila
7.43bRorqual· Auggie Alpha 01 · 4-HWWF
12.04bRorqual· Colin Knights · J105632
4.76bRorqual· Vants Doocam · 8-BEW8
7.41bRorqual· Tarkus Fuzzy · 8-2JZA
6.30bRorqual· Otsaras Momaki · MD-0AW
5.41bRorqual· Kingwu 1988 · Y-ZXIO
6.96bRorqual· StorkZZ · F9SX-1
5.73bRequired Skills
Attributes
Activation Cost1500.0 GJ
Structure HP40
Powergrid Usage100000 MW
CPU Usage50 tf
Cycle Time60.0s
Reprocessing Materials
Properties
Type ID62636
Group ID4174
Category ID7
Volume2,000 m³
Portion Size1
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-18151.47m4
2026-05-17150.14m7
2026-05-16144.57m4
2026-05-15150.80m1
2026-05-14145.97m3
2026-05-13141.23m3
2026-05-12151.35m2
2026-05-11151.43m4
2026-05-10151.48m5
2026-05-09151.50m2
2026-05-08136.45m2
2026-05-07151.70m2
2026-05-05151.75m2
2026-05-04152.80m2
2026-05-03144.65m4
2026-05-02138.37m3
2026-05-01153.90m3
2026-04-30151.08m5
2026-04-29154.05m4
2026-04-27152.94m5
2026-04-25155.80m1
2026-04-24153.25m4
2026-04-23150.47m12
2026-04-22152.03m3
2026-04-21153.80m3
2026-04-20154.60m1
2026-04-19152.09m7
2026-04-18149.72m4
2026-04-17151.60m2
2026-04-16153.63m4