Capital Mercoxit Compressor I
Capital Mercoxit Compressor I — Compressors (Module) — EVE Online item
This module uses ORE's latest materials compression technology to enable compression of harvested Mercoxit ore by a ship operating with an industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Jita Price
132.80m ISK
90d Avg
114.74m ISK
Volume
2,000 m³
Base Price
91.28m ISK
Jita Market (90d)
Latest Price (2026-08-19)
132.80m ISK
90d Average
114.74m ISK
90d High
300.00m ISK
90d Low
51.02m ISK
Avg Daily Volume
2
Recent Destructions
View all →Rorqual· Oversear · B-588R
8.49bRorqual· JordanAstone Astone · S-E6ES
11.05bRorqual· Koon Agnis · UZ-QXW
7.86bRorqual· Skorhard · TZN-2V
11.55bRorqual· Rocky Mcneely · HO4E-Q
7.80bRorqual· Odissei Okaski · 7LHB-Z
17.86bRorqual· LoneWolfHunter4 · 2CG-5V
9.00bRorqual· LoneWolfHunter4 · T-ZWA1
6.98bRorqual· Not Coral · 4CJ-AC
8.51bRorqual· Aris Alixus · TZN-2V
11.63bRequired Skills
Attributes
Activation Cost1500.0 GJ
Structure HP40
Powergrid Usage100000 MW
CPU Usage50 tf
Cycle Time60.0s
Reprocessing Materials
Properties
Type ID62635
Group ID4174
Category ID7
Volume2,000 m³
Packaged Volume2,000 m³
Portion Size1
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-19132.80m1
2026-08-18132.45m2
2026-08-15113.95m2
2026-08-14138.40m1
2026-08-13122.72m3
2026-08-11138.40m1
2026-08-10138.40m1
2026-08-09138.40m1
2026-08-08138.50m1
2026-08-07116.60m1
2026-08-06116.50m1
2026-08-05114.12m5
2026-08-04109.10m1
2026-08-03116.50m2
2026-08-0289.32m1
2026-08-0189.18m1
2026-07-31141.60m1
2026-07-30152.00m1
2026-07-2888.23m1
2026-07-27172.50m1
2026-07-26163.21m3
2026-07-2486.59m1
2026-07-23129.50m1
2026-07-22129.20m2
2026-07-21119.50m2
2026-07-2095.72m2
2026-07-18129.40m1
2026-07-17129.30m1
2026-07-1680.25m1
2026-07-15103.95m2