Capital Ice Compressor I
Capital Ice Compressor I — Compressors (Module) — EVE Online item
This module uses ORE's latest materials compression technology to enable compression of harvested ice resources by a ship operating with an industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Jita Price
74.72m ISK
90d Avg
77.87m ISK
Volume
2,000 m³
Base Price
60.00m ISK
Jita Market (90d)
Latest Price (2026-05-18)
74.72m ISK
90d Average
77.87m ISK
90d High
82.48m ISK
90d Low
72.19m ISK
Avg Daily Volume
3
Recent Destructions
View all →Rorqual· SURReaL WaRLight · 5-P1Y2
5.46bRorqual· Alix Krey · VNPF-7
7.77bRorqual· Mistress Rose · U-HYMT
6.96bRorqual· Shadow Oak · Y0-BVN
6.70bRorqual· Banahe Badasaz · Maila
7.43bRorqual· Warok Nolen · H-93YV
7.53bRorqual· Jarin Darkstar · 5J-62N
8.10bRorqual· TheJookeer9722 · Y0-BVN
8.30bRorqual· boriths sorenson · O94U-A
7.96bRorqual· Ger Akiga · Q7-FZ8
4.15bRequired Skills
Attributes
Activation Cost1500.0 GJ
Structure HP40
Powergrid Usage100000 MW
CPU Usage50 tf
Cycle Time60.0s
Reprocessing Materials
Properties
Type ID62633
Group ID4174
Category ID7
Volume2,000 m³
Portion Size1
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-1874.72m5
2026-05-1774.62m3
2026-05-1674.62m3
2026-05-1574.51m2
2026-05-1474.50m2
2026-05-1374.64m4
2026-05-1274.50m2
2026-05-1174.85m1
2026-05-1074.85m1
2026-05-0974.86m2
2026-05-0774.60m3
2026-05-0674.09m3
2026-05-0574.64m4
2026-05-0474.86m1
2026-05-0374.54m5
2026-05-0274.23m5
2026-05-0174.58m3
2026-04-3074.81m2
2026-04-2974.07m1
2026-04-2874.86m1
2026-04-2774.46m4
2026-04-2674.47m2
2026-04-2574.60m3
2026-04-2378.00m1
2026-04-2276.43m3
2026-04-2175.93m1
2026-04-2073.92m1
2026-04-1978.17m4
2026-04-1876.03m6
2026-04-1678.21m5