Capital Asteroid Ore Compressor I
Capital Asteroid Ore Compressor I — Compressors (Module) — EVE Online item
This module uses ORE's latest materials compression technology to enable compression of harvested asteroid ore by a ship operating with an industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Jita Price
36.04m ISK
90d Avg
34.74m ISK
Volume
2,000 m³
Base Price
24.34m ISK
Jita Market (90d)
Latest Price (2026-08-23)
36.04m ISK
90d Average
34.74m ISK
90d High
40.49m ISK
90d Low
23.56m ISK
Avg Daily Volume
4
Recent Destructions
View all →Rorqual· Raffy Lee · Jovainnon
6.49bRorqual· Pis Aishai · 111-F1
9.57bRorqual· Xavril Oramara · LZ-6SU
7.96bRorqual· IaMiner · Astabih
17.58bRorqual· Helena Hekard · 6UT-1K
5.14bRorqual· Varabeshi Mayaki · Sechmaren
6.04bRorqual· Dos Nachos · Erila
9.63bRorqual· Bad Ass Type-40 · HE-V4V
7.12bRorqual· mercan gold · 4-HWWF
7.24bRorqual· Jacky Xiaohei · G-LOIT
10.46bRequired Skills
Attributes
Activation Cost1500.0 GJ
Structure HP40
Powergrid Usage100000 MW
CPU Usage50 tf
Cycle Time60.0s
Reprocessing Materials
Properties
Type ID62632
Group ID4174
Category ID7
Volume2,000 m³
Packaged Volume2,000 m³
Portion Size1
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-2336.04m1
2026-08-2230.35m7
2026-08-2131.23m2
2026-08-2036.16m2
2026-08-1936.22m2
2026-08-1836.29m2
2026-08-1736.22m4
2026-08-1636.31m4
2026-08-1436.59m2
2026-08-1333.96m4
2026-08-1225.96m1
2026-08-1133.96m4
2026-08-1030.47m4
2026-08-0932.34m5
2026-08-0833.09m6
2026-08-0736.74m1
2026-08-0631.84m2
2026-08-0532.96m3
2026-08-0436.99m2
2026-08-0235.02m4
2026-08-0133.84m8
2026-07-3137.52m3
2026-07-3030.23m20
2026-07-2934.63m2
2026-07-2830.12m1
2026-07-2735.16m2
2026-07-2638.28m6
2026-07-2539.76m2
2026-07-2434.62m4
2026-07-2337.09m5