Large Mercoxit Compressor I
Large Mercoxit Compressor I — Compressors (Module) — EVE Online item
This module uses ORE's latest materials compression technology to enable compression of harvested Mercoxit ore by a ship operating with an industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Compressors are also equipped with powerful computer arrays and logistics firmware that can interface with other ships in mining fleets. These features allow for high-efficiency fleet logistics co-ordination, permitting rapid transfer, cargo-handling, and compression of materials across the fleet.
Activation of a compressor requires any ship using it to have an active industrial core.
Jita Price
58.35m ISK
90d Avg
62.09m ISK
Volume
1,000 m³
Base Price
45.00m ISK
Jita Market (90d)
Latest Price (2026-05-23)
58.35m ISK
90d Average
62.09m ISK
90d High
120.00m ISK
90d Low
42.93m ISK
Avg Daily Volume
4
Recent Destructions
View all →Orca· The0neand0nly · Ahbazon
3.76bOrca· Manne36 · 4N-BUI
1.45bOrca· Jin Aoken Koraka · UB-UQZ
2.83bOrca· Maurdakar · JTA2-2
1.43bOrca· Musisto Kashuken · NZW-ZO
1.43bOrca· Token Afro · TV8-HS
1.76bOrca· Klim Sanuich · Q-HJ97
1.94bOrca· netinamoo neti · 5IH-GL
2.06bOrca· trexsod · BWI1-9
2.03bOrca· Claire Heleneto · PO-3QW
1.72bRequired Skills
Attributes
Activation Cost200.0 GJ
Structure HP40
Powergrid Usage50 MW
CPU Usage20 tf
Cycle Time60.0s
Reprocessing Materials
Properties
Type ID62630
Group ID4174
Category ID7
Volume1,000 m³
Portion Size1
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-2358.35m14
2026-05-2255.01m5
2026-05-2153.90m2
2026-05-2060.68m1
2026-05-1959.86m5
2026-05-1861.73m2
2026-05-1759.25m3
2026-05-1658.11m4
2026-05-1575.61m2
2026-05-1479.80m16
2026-05-1389.75m4
2026-05-1280.61m29
2026-05-1199.46m5
2026-05-1099.50m7
2026-05-0992.00m2
2026-05-0886.33m2
2026-05-07119.50m2
2026-05-0650.97m1
2026-05-05115.00m2
2026-05-0480.22m4
2026-05-0356.95m3
2026-05-0269.85m2
2026-05-0169.25m4
2026-04-3068.50m1
2026-04-2967.17m1
2026-04-2868.06m2
2026-04-2768.58m3
2026-04-2658.74m4
2026-04-2467.72m2
2026-04-2362.10m3