Women's Radioactives Reclamation Goggles
EyewearWomen's Radioactives Reclamation Goggles — Eyewear (Apparel) — EVE Online item
Extraction and processing of radioactive materials for use in industry can be difficult and hazardous work at best, with many standard mining techniques often treating such materials as waste byproducts that are better disposed of in space. Always on the look out for ways to increase the profitability of their mining and materials harvesting operations, ORE has established a specialist Radioactives Reclamation unit, equipped with dedicated harvesting and transport ships, to exploit dangerous and difficult to work radioactive materials.
Radioactives Reclamation Specialists are easily recognised by the vivid "radioactive green" highlighting on the otherwise standard blue and grey of their protective goggles. The goggles are designed to protect the eyes against various forms of radiation but, like the suits the specialists wear, also incorporate a repulsion field shielding the head from any radiation, particles or loose dust given off by the materials the wearer may be handling in the course of their work.
Radioactives Reclamation Specialists are easily recognised by the vivid "radioactive green" highlighting on the otherwise standard blue and grey of their protective goggles. The goggles are designed to protect the eyes against various forms of radiation but, like the suits the specialists wear, also incorporate a repulsion field shielding the head from any radiation, particles or loose dust given off by the materials the wearer may be handling in the course of their work.
Jita Price
2.95m ISK
90d Avg
1.59m ISK
Volume
0.1 m³
Jita Market (90d)
Latest Price (2026-08-30)
2.95m ISK
90d Average
1.59m ISK
90d High
9.96m ISK
90d Low
147.0k ISK
Avg Daily Volume
6
Properties
Type ID60645
GroupEyewear (1083)
Category ID30
Mass0.5 kg
Volume0.1 m³
Packaged Volume0.1 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-302.95m2
2026-08-29888.9k5
2026-08-27888.9k1
2026-08-22912.1k6
2026-08-213.02m2
2026-08-201.01m5
2026-08-193.02m10
2026-08-181.00m4
2026-08-171.89m48
2026-08-162.17m1
2026-08-15924.0k1
2026-08-14924.0k2
2026-08-12924.0k1
2026-08-11924.0k5
2026-08-10924.1k2
2026-08-081.23m9
2026-08-072.31m1
2026-08-06924.0k1
2026-08-041.62m2
2026-08-031.62m2
2026-08-02924.0k3
2026-08-01940.0k1
2026-07-311.17m6
2026-07-291.57m2
2026-07-271.82m3
2026-07-241.57m2
2026-07-19801.5k2
2026-07-18801.2k4
2026-07-17801.7k3
2026-07-159.96m1