Unstable Assault Damage Control Mutaplasmid

Unstable Assault Damage Control Mutaplasmid

Assault Damage Control Mutaplasmids

Unstable Assault Damage Control Mutaplasmid — Mutaplasmids (Commodity) — EVE Online item

This bioadaptive mutaplasmid tool is designed to interface with and alter devices that mitigate the impact of critical system damage and provide short bursts of extreme damage resistances. As such this mutaplasmid could be used to mutate the performance characteristics of assault damage control modules.

Triglavian bioadaptive technology makes extensive use of engineered colonies of extremophilic bacteria, that are used to grow, harvest and adapt various resources found in Abyssal Deadspace. Artificial colonizing plasmids integrated into specialist tools used for direct adaptation of technology can be found in Triglavian caches in various stages of development. These mutaplasmids can be used to alter the characteristics of a wide variety of equipment types, depending on the strain and the bioadaptive tool with which they are integrated.

The mutaplasmid colony integrated into this bioadaptive tool is highly unstable, with a high rate of reproduction and mutation. The mutational benefits of using this mutaplasmid are potentially very high but the risks are also extreme.
Jita Price
12.63m ISK
90d Avg
16.60m ISK
Volume
1
Base Price
1.0k ISK
Jita Market (90d)
Latest Price (2026-07-13)
12.63m ISK
90d Average
16.60m ISK
90d High
22.54m ISK
90d Low
10.07m ISK
Avg Daily Volume
10
Properties
Type ID52231
Group ID1964
Category ID17
Mass1 kg
Volume1 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-1312.63m1
2026-07-1218.90m8
2026-07-1112.33m1
2026-07-1012.25m1
2026-07-0818.42m12
2026-07-0716.37m17
2026-07-0616.68m8
2026-07-0514.63m30
2026-07-0310.16m1
2026-07-0213.00m1
2026-06-2912.54m4
2026-06-2814.97m10
2026-06-2710.82m11
2026-06-2611.09m1
2026-06-2511.05m1
2026-06-2310.14m10
2026-06-2116.72m1
2026-06-2016.72m1
2026-06-1815.90m7
2026-06-1612.45m4
2026-06-1415.80m2
2026-06-1216.79m20
2026-06-1116.70m3
2026-06-1015.04m6
2026-06-0915.93m2
2026-06-0716.31m38
2026-06-0615.00m7
2026-06-0515.00m3
2026-06-0418.01m1
2026-06-0215.39m4