Standup Target Painter II

Standup Target Painter II

Structure Tech IITarget Painters

Standup Target Painter II — Structure Tech II Structure Disruption Battery (Structure Module) — EVE Online item

The Standup Target Painter is an electronic warfare system that uses Upwell Proprietary Weapon Navigation Technology to project an electronic "tag" onto the target ship, effectively increasing the signature of the target and thereby making it easier to track and hit. The Target Painter system can be installed as a module in Upwell technology structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Jita Price
73.60m ISK
90d Avg
84.97m ISK
Volume
4,000
Jita Market (90d)
Latest Price (2026-05-18)
73.60m ISK
90d Average
84.97m ISK
90d High
155.80m ISK
90d Low
53.60m ISK
Avg Daily Volume
7
Variations(2)
Standup Target Painter II
Standup Target Painter II
Structure Tech II
Standup Target Painter I
Standup Target Painter I
Structure Tech I
Attributes
Activation Cost1200.0 GJ
Structure HP40
Powergrid Usage60000 MW
CPU Usage1800 tf
Cycle Time10.0s
Signature Radius Modifier72.0%
Properties
Type ID47366
Group ID1719
Category ID66
Mass500 kg
Volume4,000 m³
Portion Size1
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-1873.60m7
2026-05-1772.42m7
2026-05-1673.63m12
2026-05-1573.94m3
2026-05-1470.19m5
2026-05-1368.14m6
2026-05-1271.74m7
2026-05-1164.12m2
2026-05-1073.07m9
2026-05-0972.65m8
2026-05-0864.70m7
2026-05-0769.42m13
2026-05-0678.88m4
2026-05-0586.37m2
2026-05-0486.92m3
2026-05-0367.24m20
2026-05-0283.37m2
2026-05-0188.31m3
2026-04-3099.21m7
2026-04-29100.87m7
2026-04-28101.50m5
2026-04-27106.00m3
2026-04-26108.28m5
2026-04-2577.65m20
2026-04-2497.36m6
2026-04-23105.55m11
2026-04-22115.60m4
2026-04-21118.06m5
2026-04-20103.30m7
2026-04-19105.57m4