Standup Missile Guidance Enhancer II

Standup Missile Guidance Enhancer II

Structure Tech IIMissile Guidance Enhancers

Standup Missile Guidance Enhancer II — Structure Tech II Structure Weapon Upgrade (Structure Module) — EVE Online item

Market/Structure Equipment/Structure Weapons/Weapon Upgrades/Standup Missile Guidance Enhancer II
The Standup Missile Guidance Enhancer enhances the ranges and precision of missiles launched from missile systems installed in the same structure. Structure operators can expect to see enhanced missile flight time, velocity and explosion characteristics when installing the Missile Guidance Enhancer as a module in Upwell technology structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Jita Price
118.90m ISK
90d Avg
116.70m ISK
Volume
4,000
Jita Market (90d)
Latest Price (2026-08-16)
118.90m ISK
90d Average
116.70m ISK
90d High
128.80m ISK
90d Low
862.6k ISK
Avg Daily Volume
2
Variations(2)
Standup Missile Guidance Enhancer II
Standup Missile Guidance Enhancer II
Structure Tech II
Standup Missile Guidance Enhancer I
Standup Missile Guidance Enhancer I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-16118.90m1
2026-08-1468.64m3
2026-08-12102.84m2
2026-08-1186.41m1
2026-08-1088.83m5
2026-08-08119.50m2
2026-08-07119.55m2
2026-08-06108.61m3
2026-08-05119.70m4
2026-08-04119.70m1
2026-08-02119.70m1
2026-08-01119.60m1
2026-07-31119.70m1
2026-07-3086.38m2
2026-07-29115.81m5
2026-07-28122.00m1
2026-07-27123.50m1
2026-07-26123.40m2
2026-07-2486.29m1
2026-07-23123.90m1
2026-07-2286.29m1
2026-07-21123.80m1
2026-07-20123.75m2
2026-07-19122.80m1
2026-07-16123.85m2
2026-07-15123.90m6
2026-07-14120.92m4
2026-07-13123.80m1
2026-07-11111.36m6
2026-07-1098.86m3