Standup Stasis Webification Burst Projector
Structure Tech IStructure Burst ProjectorsStandup Stasis Webification Burst Projector — Structure Tech I Structure Burst Projector (Structure Module) — EVE Online item
Emits an area-of-effect burst centered on the designated location. The burst reduces the maximum speed of the affected ships. Only one module of this type can be fit per structure.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
159.80m ISK
90d Avg
159.29m ISK
Volume
4,000 m³
Jita Market (90d)
Latest Price (2026-05-22)
159.80m ISK
90d Average
159.29m ISK
90d High
180.00m ISK
90d Low
125.00m ISK
Avg Daily Volume
1
Recent Destructions
View all →Fortizar· Unknown Pilot · HO4E-Q
27.74bAstrahus· Unknown Pilot · Ignoitton
2.97bKeepstar· Unknown Pilot · B-9C24
321.96bRaitaru· Unknown Pilot · J121116
4.46bFortizar· Unknown Pilot · J170151
28.52bAstrahus· Unknown Pilot · C-NMG9
2.42bFortizar· Unknown Pilot · IS-OBW
20.43bAthanor· Unknown Pilot · J142533
5.03bFortizar· Unknown Pilot · DJ-GBH
17.00bTatara· Unknown Pilot · J-D5U7
11.62bAttributes
Activation Cost18000.0 GJ
Structure HP40
Velocity Modifier-55.0%
Powergrid Usage170000 MW
CPU Usage3900 tf
Cycle Time120.0s
Reprocessing Materials
Properties
Type ID47071
Group ID1331
Category ID66
Mass500 kg
Volume4,000 m³
Portion Size1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-22159.80m2
2026-05-20159.50m1
2026-05-19159.10m1
2026-05-15159.30m1
2026-05-07159.20m1
2026-05-06125.00m1
2026-05-04125.20m1
2026-05-03159.20m1
2026-04-29159.30m1
2026-04-28159.50m1
2026-04-24159.75m2
2026-04-21159.85m2
2026-04-17155.00m2
2026-04-09168.50m1
2026-04-02168.90m1
2026-03-29168.90m1
2026-03-23169.80m1
2026-03-21151.00m1
2026-03-09179.00m1
2026-03-01180.00m1