Standup M-Set Biochemical Reactor Material Efficiency I

Standup M-Set Biochemical Reactor Material Efficiency I

Structure Tech IMedium Structure Resource Processing Rigs

Standup M-Set Biochemical Reactor Material Efficiency I — Structure Tech I Structure Biochemical Reactor Rig M - ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Resource Processing Rigs/Standup M-Set Biochemical Reactor Material Efficiency I
The Standup M-Set Biochemical Reactor Material Efficiency I rig provides a means for structure operators to decrease material requirements for biochemical reactions in their Upwell Refinery structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
320.00m ISK
90d Avg
395.70m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-05-21)
320.00m ISK
90d Average
395.70m ISK
90d High
503.00m ISK
90d Low
297.90m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Biochemical Reactor Material Efficiency II
Standup M-Set Biochemical Reactor Material Efficiency II
Structure Tech II
Standup M-Set Biochemical Reactor Material Efficiency I
Standup M-Set Biochemical Reactor Material Efficiency I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID46494
Group ID1938
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-21320.00m1
2026-05-17365.00m1
2026-05-12389.00m1
2026-05-10347.40m2
2026-05-09350.00m1
2026-05-08375.00m1
2026-05-07380.00m1
2026-05-05388.00m2
2026-05-02323.90m2
2026-04-30355.00m1
2026-04-29356.50m2
2026-04-26500.00m1
2026-04-24392.45m2
2026-04-18384.90m1
2026-04-17385.00m2
2026-04-12390.00m1
2026-04-09390.00m1
2026-04-03389.20m2
2026-03-31390.00m1
2026-03-29395.00m1
2026-03-26395.00m1
2026-03-24408.00m2
2026-03-23405.00m1
2026-03-17410.00m1
2026-03-12430.00m1
2026-03-10449.00m1
2026-03-09399.90m1
2026-03-05415.00m1
2026-03-02410.00m1
2026-02-28502.60m1