Loki Offensive - Launcher Efficiency Configuration
Tech IIIMinmatar Offensive SubsystemsLoki Offensive - Launcher Efficiency Configuration — Tech III Offensive Subsystem (Subsystem) — EVE Online item
Market/Ship and Module Modifications/Subsystems/Offensive Subsystem/Loki Offensive - Launcher Efficiency Configuration
Adaptation and innovation go hand-in-hand, and this subsystem is a prime example of both ideas. While researching Sleeper drone weapon systems, a group of Minmatar engineers discovered that Sleeper launcher hardpoint design allowed for a vast increase to the rate of fire without increasing powergrid requirements. The resulting subsystem allows the Loki to achieve some of the most aggressive missile configurations seen on any cruiser.
Jita Price
36.81m ISK
90d Avg
37.61m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-10-03)
36.81m ISK
90d Average
37.61m ISK
90d High
42.65m ISK
90d Low
33.27m ISK
Avg Daily Volume
98
Variations(3)
Loki Offensive - Projectile Scoping Array
Tech III
Loki Offensive - Launcher Efficiency Configuration
Tech III
Loki Offensive - Support Processor
Tech III
Recent Destructions
View all →Loki· AngelFit · 5V-Q1R
628.48mLoki· Loren Mrazz · Zazamye
1.13bLoki· Riley Rockwell · Amoen
644.22mLoki· Twinkie69 · J172139
669.26mLoki· lisa 8 · X47L-Q
1.10bLoki· Hadrian Lafisques · Vecamia
807.84mLoki· Teizo Amatin · J104459
512.46mLoki· TuXyWHuK · S25C-K
2.50bLoki· ssttdumplings · HYPL-V
2.85bLoki· Akva dai deneg · BZ-0GW
1.19bRequired Skills
Attributes
Structure HP40
Powergrid Output150 MW
CPU Output150 tf
Drone Bandwidth40 Mbit/s
Reprocessing Materials
Properties
Type ID45608
Category ID32
Mass800,000 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius500 m
Meta Level1
Tech Level3
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0336.81m105
2026-10-0236.52m79
2026-10-0136.93m85
2026-09-3037.16m126
2026-09-2936.91m88
2026-09-2837.20m116
2026-09-2737.38m154
2026-09-2636.98m159
2026-09-2536.83m73
2026-09-2436.99m75
2026-09-2336.75m89
2026-09-2236.65m86
2026-09-2137.02m94
2026-09-2036.90m94
2026-09-1937.10m100
2026-09-1837.21m85
2026-09-1737.00m97
2026-09-1637.15m46
2026-09-1537.25m63
2026-09-1437.17m93
2026-09-1337.62m175
2026-09-1237.14m84
2026-09-1137.29m60
2026-09-1037.78m118
2026-09-0937.64m77
2026-09-0837.43m72
2026-09-0737.13m89
2026-09-0636.49m107
2026-09-0536.47m119
2026-09-0436.16m74