Loki Offensive - Projectile Scoping Array
Tech IIIMinmatar Offensive SubsystemsLoki Offensive - Projectile Scoping Array — Tech III Offensive Subsystem (Subsystem) — EVE Online item
Market/Ship and Module Modifications/Subsystems/Minmatar Subsystems/Loki Offensive - Projectile Scoping Array
Scoping arrays were mostly out of fashion in recent ship design, but Sleeper technology has brought them somewhat back into vogue. Based upon the remarkable flexibility fullerene-based technology, Sleeper-based scoping arrays allowed projectile weaponry to produce longer-ranged accuracy without reducing the weapon's rate-of-fire. While a resurgence of scoping arrays is not expected, this subsystem certainly shows its uses in modern warfare.
Jita Price
35.98m ISK
90d Avg
36.27m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-07-12)
35.98m ISK
90d Average
36.27m ISK
90d High
39.80m ISK
90d Low
20.25m ISK
Avg Daily Volume
33
Variations(3)
Loki Offensive - Projectile Scoping Array
Tech III
Loki Offensive - Launcher Efficiency Configuration
Tech III
Loki Offensive - Support Processor
Tech III
Recent Destructions
View all →Loki· sibazon · Aeschee
1.42bLoki· Rasean Gainey · DP-JD4
577.35mLoki· xiumu Dallocort · B9E-H6
603.82mLoki· ZeroRelogins · Eredan
775.57mLoki· MacGybo · Eugales
782.85mLoki· Tyrone Trald · J101028
596.43mLoki· Rapid Brother · Kiainti
763.97mLoki· Hanibal Bastanold · J115347
493.60mLoki· sibazon · DT-PXH
1.09bLoki· Tolmeron · Goinard
802.79mRequired Skills
Attributes
Structure HP40
Powergrid Output300 MW
CPU Output30 tf
Drone Bandwidth25 Mbit/s
Reprocessing Materials
Properties
Type ID45607
Group ID956
Category ID32
Mass800,000 kg
Volume40 m³
Portion Size1
Radius500 m
Meta Level1
Tech Level3
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-1235.98m59
2026-07-1137.08m23
2026-07-1038.05m53
2026-07-0937.23m104
2026-07-0836.55m32
2026-07-0735.84m38
2026-07-0636.08m49
2026-07-0536.43m26
2026-07-0436.42m30
2026-07-0336.84m59
2026-07-0236.74m36
2026-07-0137.07m17
2026-06-3035.69m42
2026-06-2936.22m21
2026-06-2836.22m71
2026-06-2736.06m68
2026-06-2635.08m20
2026-06-2535.01m16
2026-06-2435.24m16
2026-06-2335.10m29
2026-06-2235.24m16
2026-06-2135.44m31
2026-06-2035.69m23
2026-06-1934.80m30
2026-06-1835.44m19
2026-06-1735.78m27
2026-06-1634.72m18
2026-06-1532.19m27
2026-06-1435.77m46
2026-06-1335.10m41