Loki Offensive - Projectile Scoping Array
Tech IIIMinmatar Offensive SubsystemsLoki Offensive - Projectile Scoping Array — Tech III Offensive Subsystem (Subsystem) — EVE Online item
Market/Ship and Module Modifications/Subsystems/Offensive Subsystem/Loki Offensive - Projectile Scoping Array
Scoping arrays were mostly out of fashion in recent ship design, but Sleeper technology has brought them somewhat back into vogue. Based upon the remarkable flexibility fullerene-based technology, Sleeper-based scoping arrays allowed projectile weaponry to produce longer-ranged accuracy without reducing the weapon's rate-of-fire. While a resurgence of scoping arrays is not expected, this subsystem certainly shows its uses in modern warfare.
Jita Price
39.80m ISK
90d Avg
36.49m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-10-11)
39.80m ISK
90d Average
36.49m ISK
90d High
42.95m ISK
90d Low
30.14m ISK
Avg Daily Volume
37
Variations(3)
Loki Offensive - Projectile Scoping Array
Tech III
Loki Offensive - Launcher Efficiency Configuration
Tech III
Loki Offensive - Support Processor
Tech III
Recent Destructions
View all →Loki· Iperoz · Jita
838.01mLoki· SophisticMilk53 · Abudban
684.96mLoki· sewc · Taff
1.32bLoki· RaffaeleITA · Uemon
457.11mLoki· sewc · Taff
1.32bLoki· Raziel Vyvorant · Ishisomo
760.03mLoki· Val Fox · Raneilles
650.08mLoki· Damian Vizharan · Ikao
763.25mLoki· Guardex · Z3V-1W
526.19mLoki· Talanto · Rahadalon
510.91mRequired Skills
Attributes
Structure HP40
Powergrid Output300 MW
CPU Output30 tf
Drone Bandwidth25 Mbit/s
Reprocessing Materials
Properties
Type ID45607
Category ID32
Mass800,000 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius500 m
Meta Level1
Tech Level3
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-1139.80m43
2026-10-1037.40m89
2026-10-0937.09m89
2026-10-0836.57m86
2026-10-0736.84m34
2026-10-0636.58m67
2026-10-0535.92m72
2026-10-0435.80m91
2026-10-0335.41m49
2026-10-0235.41m52
2026-10-0136.06m41
2026-09-3035.69m40
2026-09-2935.66m25
2026-09-2835.06m27
2026-09-2734.71m31
2026-09-2635.16m35
2026-09-2535.68m39
2026-09-2434.71m13
2026-09-2335.18m39
2026-09-2235.74m28
2026-09-2135.79m20
2026-09-2034.90m48
2026-09-1935.96m53
2026-09-1836.92m17
2026-09-1736.58m45
2026-09-1636.39m25
2026-09-1536.65m66
2026-09-1436.43m64
2026-09-1335.70m38
2026-09-1235.92m43