Standup M-Set Thukker Basic Capital Component Manufacturing Material Efficiency

Standup M-Set Thukker Basic Capital Component Manufacturing Material Efficiency

Structure FactionMedium Structure Engineering Rigs

Standup M-Set Thukker Basic Capital Component Manufacturing Material Efficiency — Structure Faction Structure Engineering Rig M - Basic Capital Component ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Thukker Basic Capital Component Manufacturing Material Efficiency
This rig has been optimized for use in low security space and will provide reduced benefits in all other areas of space.

The Standup M-Set Thukker Capital Component Manufacturing Material Efficiency rig provides a means for structure operators to decrease material requirements when manufacturing basic capital ship construction components in their Upwell structures.

This facility design has been modified by Thukker specialists to utilize certain unregulated opportunities for expediting capital ship component construction in low security space.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
363.50m ISK
90d Avg
364.19m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-07-01)
363.50m ISK
90d Average
364.19m ISK
90d High
398.90m ISK
90d Low
328.10m ISK
Avg Daily Volume
2
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID45544
Group ID1839
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-01363.50m2
2026-06-29343.15m2
2026-06-22350.00m1
2026-05-29398.00m1
2026-05-28398.90m1
2026-05-14367.50m3
2026-05-03328.30m2