Standup Composite Reactor I

Standup Composite Reactor I

Structure Tech IResource Processing Service Modules

Standup Composite Reactor I — Structure Tech I Structure Resource Processing Service Module (Structure Module) — EVE Online item

Market/Structure Equipment/Service Modules/Standup Composite Reactor I
The Standup Composite Reactor I is a service module that allows reacting of the moon materials used for creation of Tech II items and ships.
This specialized service module must be installed into an Upwell Refinery structure in order to operate. Due to CONCORD health and safety regulations this service module may not be used within high security space.

While an Upwell Structure has at least one service module online, it will enter "full power" mode and gain significantly increased shield and armor hitpoints and an extra reinforcement cycle.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
159.02m ISK
90d Avg
157.66m ISK
Volume
4,000
Jita Market (90d)
Latest Price (2026-08-16)
159.02m ISK
90d Average
157.66m ISK
90d High
185.50m ISK
90d Low
99.89m ISK
Avg Daily Volume
2
Attributes
Powergrid Usage40000 MW
CPU Usage200 tf
Properties
Type ID45537
Group ID1322
Category ID66
Mass500 kg
Volume4,000 m³
Packaged Volume4,000 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-16159.02m6
2026-08-15167.40m4
2026-08-14160.25m6
2026-08-13134.95m2
2026-08-12160.00m1
2026-08-11128.03m3
2026-08-10159.07m3
2026-08-09168.55m2
2026-08-08129.90m1
2026-08-07161.40m5
2026-08-06151.40m2
2026-08-05151.50m2
2026-08-04168.00m1
2026-08-03169.45m2
2026-08-02143.57m4
2026-08-01135.15m2
2026-07-31169.50m2
2026-07-30135.20m1
2026-07-28135.10m1
2026-07-26177.10m1
2026-07-25135.00m1
2026-07-24135.00m2
2026-07-23157.75m2
2026-07-22137.07m3
2026-07-20184.60m1
2026-07-19184.80m1
2026-07-18185.20m1
2026-07-16185.30m1
2026-07-15167.23m3
2026-07-14166.13m3