Standup M-Set Blueprint Copy Cost Optimization I

Standup M-Set Blueprint Copy Cost Optimization I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Blueprint Copy Cost Optimization I — Structure Tech I Structure Engineering Rig M - Blueprint Copy Cost Optimization (Structure Module) — EVE Online item

The Standup M-Set Blueprint Copy Cost Optimization I rig provides a means for structure operators to decrease cost requirements when copying in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
115.00m ISK
90d Avg
116.18m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-09-27)
115.00m ISK
90d Average
116.18m ISK
90d High
121.00m ISK
90d Low
100.10m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Blueprint Copy Cost Optimization II
Standup M-Set Blueprint Copy Cost Optimization II
Structure Tech II
Standup M-Set Blueprint Copy Cost Optimization I
Standup M-Set Blueprint Copy Cost Optimization I
Structure Tech I